Laserfiche WebLink
UST Response Plan (12/2010) - V3 <br />UNDERGROUND STORAGE TANK <br />RESPONSE PLAN - PAGE 1 (One form per facility) <br />TYPE OF ACTION ❑ 1. NEW PLAN Gd2. CHANGE OF INFORMATION Rol. <br />I. FACILITY INFORMATION <br />FACILITY ID N (Agency Use On(v) <br />BUSINESS NAME (Same as FAC% ITY NAME) Roz, <br />Nv G <br />BUSINESS SITE ADDRESS Ras, <br />CITY R04. <br />it tt/a L) <br />15facXA-ay) <br />II. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan. <br />➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will he managed as hazardous waste. <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non-hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br />appropriately. <br />➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds <br />that it is non-hazardous. If the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick floating petroleum layer may not necessarily display <br />rainbow colors. Water (hazardous or non-hazardous) from sumps, spill containers, etc. will not be disposed to storm water systems. <br />• We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />L Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE 1[F NEEDED: (Complete nly if applicable) <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />RIO. <br />R20. <br />k30. <br />R11. <br />R21. <br />R31. <br />R 12. <br />R22. <br />R32. <br />R13. <br />R23. <br />R33. <br />R14, <br />R14. <br />R34. <br />R15, <br />R25, <br />R35, <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) LS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THUS RESPONSE PLAN: <br />NAME eR40. <br />IT �� � ` Q I R50. <br />NAIUQR41. <br />TITLE R51. <br />✓� o ry-eiS <br />G 2 f 4o\ +-p <br />NA Raz, <br />TITLE R52. R52. <br />Julygdo <br />W <br />NAME R43. <br />TITLE R53. <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE UNAYMORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />❑ Additional system testing or data collection LFInspection by qualified persons ❑ Recalibration of equipment <br />Other: <br />R60. <br />UST Response Plan (12/2010) - V3 <br />