SUMMARY OF PROPOSED WORK:
<br />1. INSTALL 200' DEEP WELL ANODE,
<br />2.BORE CONDUITS ACCROSS E ORCHARDRD.
<br />3. INSTALL CTS STATION, OFF SET TEST HEAD TO INSIDE CABINET.
<br />4. INSTALL CABINET WITH RECTIFIER, NO, WATCHDOG AMU, AND
<br />E ACOISCONNECT.
<br />S. INSTALL AC DISCONNECT ON POLE.
<br />S. INSTALL 2 GROUND RODS.
<br />7. TRENCHANO RACKFILL.
<br />SEQUENCE OF OPERATIONS:
<br />1. FOLLOW ALL CLEARANCE PROCEDURE.
<br />2. INSTALL DEEP WELLANODE.
<br />3. INSTALL CABINET WITH RECTI FNA, AMU, Na,
<br />ACDISCONNECT.
<br />4. CONTACT CORROSION MECHANIC PRIOR TO PUTTING
<br />INTOSERVICE
<br />5. RESTORE SITE TO ORIGINAL CONDITION.
<br />C
<br />1 1 z
<br />CONSTRUCTION NOTES:
<br />GENERAL REQUIREMENTS:
<br />1. UNDERGROUND SERVICE ALERT:
<br />CALL -800227-2600) A MINIMUM OF 2 BUSINESS DAYS INOT INCLUDING INITIALDAY OF
<br />CONT811 IIN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, INCLUDING ALL
<br />NON -UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE.
<br />2, UTILITY NOTES.
<br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION
<br />FROM SEVE HAL SOURCES, AND SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL
<br />PRIOR TO FABRICATION.
<br />B. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF
<br />UNDERGROUND UTILITIES, PROPERTY LINES, AND OTHER SUBSTRUCTURES IS NOT GUARANTEED
<br />TO BE ACCURATE OR ALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTKONPERSONWL
<br />ARE RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE AND LOCATION OF
<br />UNDERGROUND UTILITIES AND OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR
<br />ENCROACHMENTS.
<br />C. PROSPECTING IS REQUIREDAHEAD OF WORK. ALL OFFSETS OR ROPING WILL NEED TO BE
<br />AVPROVED BY THE PG&E PROJECT ENGINEER (PEO), AND RECLINED DETAILS SHOWN ON PBOFIIE
<br />AND CONSTRUCTION DETAIL SHEETS OF EACH ADDITIONAL SUBSTRUCTURE.
<br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT
<br />DIG METHODS (.B. VACUUM EXCAVATIONS OR SIMILAR).
<br />3. ELBOWS AND FIELD BENDS:
<br />A. ALL BENDS ARE SMOOTH FIELD BENDS, EXCEPT WHERE ELBOWS ARE SHOWN. FIELD BENDS
<br />SHALL BE MADE INACCORDANCE WITH A-36, SECTION 4D. FIELD BENDS MAY BE USED IN 11EU
<br />OF ELBOWS WHEN
<br />PREAPPROVED BY THE PG&E PROJECT ENGINEER (RED).
<br />B. IN ORDER TO AVOID EXCESSIVE STRAIN ON THE PIPELINE. THERE SHALL BE A MINIMUM
<br />SEPARATION OF 5 FEC BETWEEN A ROPED SECTION Of PIPELINE AND ANY ELBOWS OR FIELD
<br />BENDS.
<br />C. AULANGLES SHOWN IN THE PLAN AND PROFILE ARE APPROXIMATE AND SHALL BE CUT TO SUIT
<br />FIELD CONDITIONS.
<br />4. SEPARATION FROM OTHER STRUCTURES:
<br />A. CROSSING UNDERGROUND FACILITIES: PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST
<br />24 INCHES OF CLEARANCE FROM ANY OTHER SUBSTRUCTURE/UDIITY NOTASSOCIATED WITH
<br />THE PIPELINE UNLESS NOTED ON THE DRAWINGS.
<br />B. PARALLELING UNDERGROUND FACILITIES: THIS PIPELINE MUST BE INSTALLED WITH AT LEAST
<br />5 FEET OF CLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED
<br />WITH THE PIPELINE UNLESS NOTED ON THE DRAWINGS.
<br />S. RESTORATION AND CLEAN UP:
<br />A. RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC ABOVE PIPE BEDDING SHALL BE IN
<br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS.
<br />B. WHERE EVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12' AND
<br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED.
<br />TARE CARE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL.
<br />6. DESIGN NOTES:
<br />ATHIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS -BUILT DRAWINGS & RECORDS.
<br />ACCURACY IS DEPENDENT UPON THE SOURCE DOCUMENT LISTED ON THE REFERENCE
<br />DRAWINGS.
<br />7. WE LOING REQUIREMENTS:
<br />A. ALLARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL
<br />MAN UAL 70-4160M. ALL CANS OR SPOOLS SHALL BE A MINIMUM LENGTH OF ONE PIPE DIAMETER.
<br />WHENEVER POSSIBLE.
<br />B, INSTAIL TEST STATIONS WITH THERMITE WELD CONNECTION IN ACCORDANCE WITH GAS T & D
<br />CORROSION CONTROL MANUAL 0.10, .10.1 AND 030.2.
<br />B. WELDING:
<br />WHEN INTERNAL MISALIGNMENT EXCEEDS 0.094", BACKWELD ANY GIRTH WELD WHERE THERE 15
<br />ACCESS TO THE INSIDE OF THE WELD. WHERE THERE 15 NO ACCESS TO THE INSIDE Of THE WELD,
<br />MACHINE BORING OR GANGING IS REQUIRED. BACKW ELDING, GRINDING, ON BORING MUST BE
<br />DONE IN ACCORDANCE WITH THE APPROPRIATE UTILITY PROCEDURE IN THE GAS WELDING CONTROL
<br />MANUAL T.4161FM.
<br />9. STRENGTH TEST REQUIREMENTS
<br />A. STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD
<br />A 34 AND SHALL BE CONDUCTED IN ACCORDANCE WITH UTILITY PROCEDURE TD 41375.
<br />0. ALL WEIRS THAT HAVE NOT BEEN STRENGTH TESTED AND ALL FITTINGS SHALL BE SOAP TESTED AT
<br />100 PSI AND AT OPERATING PRESSURE BEFORE COATING CAN OCCUR.
<br />10. PAINTING AND COATING REQUIREMENTS:
<br />A. ALL E%POSED PIPE AND FITTINGS ARE TO BE PAINTED IN ACCORDANCE WITH GAS STANDARD
<br />E-30. ALL COATING ON BURIED PIPE AND FFFHNGS ARE TORE APPLIED IN ACCORDANCE WITH
<br />GAS STANDARD E-35.
<br />B. FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE.
<br />Il. INSPECTION OF EXISTING PIPFLINE:
<br />A. WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING
<br />CONSTRUCTION, FOLLOW TO.51009-01 TO DOCUMENT PIPE INSPECTION. THIS APPLIES TO EXISTING
<br />AND TO BE RETIRED FACILITIES.
<br />B. EXISTING GIRTH WELDS, AT TIE IN LOCATIONS, SHALL BE IDENTIFIED AND REMOVED IF PRACTICAL.
<br />C. PRIOR TO TIE-IN, INSPECT COATING AND PIPE FOR DEFECTS. IF AFFECTS ARE FOUND,
<br />CONTACT PED FOR GUIDANCE.
<br />12. TIE-IN AND CLEARANCE PROCEDURE TO BE PREPARED AND PERFORMED IN ACCORDANCE WITH
<br />THE FOLLOWING WORK PROCEDURES:
<br />A. ID41W 01, HOT AND COLO WORK METHODS FOR NATURAL GAS TRANSMISSION PIPEUNE
<br />SHUTDOWN AND TIE-IN.
<br />& TOA441% CTAS CLEARANCE PRMFMIRFS FON FACII ITII S OPFRATINF. OVER 60 PUG
<br />K""NIIeI'F DBIOW.
<br />CAI(1161- YOU RIO.
<br />13. COATINGREMOVAL:
<br />A PERFORM THE FOLLOWING STEPS, IN ACCORDANCE WITH TD -4731P 01, BEFORE REMOVING
<br />ASPHALTIC PIPE WRAP ON PIPEUNES INSTALLED PRIOR TO 1972 (BASED ON PG&E ANALYSIS,
<br />PIPE INSTALLED IN 1972 OR LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOSI:
<br />1. REFER TO THE 'EXISTING PIPE SPECS (PRE -1972)' STAMP TO DETERMINE IF A SAMPLE HAS
<br />BEEN COLLECTED OR IF A SAMPLE IS REQUIRED.
<br />a. 'YES" REPRESENTS HISTORICAL RESULTS ARE AVAILABLE SHOWING THAT PIPE WRAP
<br />CONTAINSASBESTOS. NO SAMPLE 15 REQUIRED.
<br />b. "NO' REPRESENTS HISTORICAL RESULTS ARE AVAILABLE AND THE PIPE WRAP DOES NOT
<br />CONTAIN ASBESTOS (CONTENT WAS NON DETECT). NO SAMPLE IS REQUIRED.
<br />c "UNKNOWN' REPRESENTS NO HISTORICAL RESULTS ARE AVAILABLE. A SAMPLE IS
<br />REQUIRED N THE PIPE INSTALLATION DATE IS PRIOR TO 1972.
<br />2. WHEN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASBESTOS:
<br />a. COLLECT SAMPLE PER 1.4711P-01 AND COMPLETE CHAIN OF CUSTODY FORM
<br />TO4711P.01401.
<br />b. FILE PINK COPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS
<br />WON THE Ai-RUILTS.
<br />3. WHENREMOVINGPIPE WRAP THAT CONTAINSASBESTOS, OR FOR EMERGENCY WORK,
<br />FOLLOW TD -4711P-01 "PIPE WRAP REMOVAL, HANDLING AND DISPOSAL".
<br />CATHODIC PROTECTION NOTES:
<br />1. FOILOWTO5l".Ol TO DOCUMENT INTERNAL CORROSION AND EXTERNALCORROSION
<br />INSPECTION OF THE PIPELINE.
<br />2. UPON COMPLETION OF BORINGS, CONTACT THE CORROSION SUPERVISOR FOR THE LOCAL
<br />AREA/DIVISION TO PERFORM CURRENT DRAIN TESTS ON THE PIPELINE SEGMENT THAT
<br />WAS INSTALLED IN THE BORE. THE CURRENT DRAIN TEST MUST BE PF RFORMED PRIOR TO
<br />WELDING PIPE ON EITHER SIDE OF THE BORE.
<br />3. FOR THE INSTALLATION OF THE OMNIMETRIK RECTIFIER REMOTE MONITOR, CONTACT THE
<br />CORROSION SUPERVISOR FOR THE LOCAL ARENDIVISION.
<br />4. BONDING CABLES TO BE INSTALLED ACROSS PIPELINE CUT-OUTS AT ALL LOCATIONS THE
<br />PIPELINE IS SEVERED PRIOR TO REMOVAL CHAIN CLAMPS, MAGNETIC CLAMPS, OR OTHER
<br />CONSTRUCTION MANAGEMENT APPROVED CLAMPS AND R6 IMIN) STRANDED CABLE SHALL
<br />REUTILIZED. CLAMPS TO REMAIN IN PLACE UNTIL PIPELINE IS TIED IN,
<br />RETIREMENT PROCEDURE FOR EXISTING PIPE:
<br />1. GT&D UTILITY WORK PROCEDURE TD 950OP-16,'DEACIVATION AND/OR RETIREMENT OF
<br />UNDERGROUND GAS FACILN'IES," SHALL BE FOLLOWED.
<br />2. THE EXISTING PI PE SECTIONS$HAL L HAVE FREE LIQUIDS REMOVED AN D BE LOOK PURGED
<br />PER GAS DESIGN STANDARD A-38, 'PROCEDURES FOR PURGING GAS FACILITIES.'
<br />3. THE PIPE SHALL BE SECTIONALIZED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN.
<br />THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO
<br />IDENTIFY THE MOST OPTIMUM LOCATION IN THAT VICINITY. ACCURATE SURVEY DATA MAY
<br />NOT BE AVAILABLE FOR THESE LOCATIONS SOUSE CAUTION DURING EXCAVATION AND WHEN
<br />IDENTIFYING THE PIPELINE TO BE RETIRED. OTHER ACTIVE PIPELINES MAY BE IN THE AREA.
<br />4. AT EACH SUCH LOCATION NOTED ABOVE. ANECE OF PIPE AT LEAST 24' LONG SHALL BE
<br />REMOVED. INSTALL A 1" HIGH PRESSURE SAVE -A -VALVE IH 17491, MD22287) TO CHECK FOR
<br />PRODUCTAND PRESSURE PRIOR TO CUTTING INTO THE PIPELINE THE OPEN ENDS OF THE
<br />RETIRED PIPE SHALL BE SEALED BY THE MOST APPROPRIATE METHOD OUTLINED IN GT&D
<br />UTIUTY WORK PROCEDURE T.9500P46. BACKFILL MUST BE THOROUGHLY COMPACTED IN
<br />PLACE OF THE REMOVED SECTION OF PIPE.
<br />DESIGN CHANGE PROCEDURE
<br />MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT
<br />ENGINEER (PED) BEFORE MAKING ANY DESIGN CHANGE TO GAS FACILITIES PER TD4014P-01.
<br />6 I 7
<br />9 1 10
<br />CONTACT INFORMATION:
<br />PROJECT MANAGER
<br />---- BPENT MAEOA
<br />925-1139348
<br />CORROSION ENGINEER
<br />--- ARE
<br />WOOD925.2BS-7838
<br />ESTIMATOR/DESIGNER
<br />FIELD ENGINEER/CM
<br />- MATTGOODWIN
<br />--- T
<br />0371-3 69 8
<br />209- 7
<br />TBD
<br />[AND PLANNER
<br />---- TBD
<br />TBD
<br />LOCAL CORROSION
<br />MECHANIC
<br />-- TBD
<br />TBD
<br />REFERENCE DRAWINGS:
<br />OPERATING MAPS .. - . N/A
<br />OPERATING DIAGRAMS --.r N/A
<br />PLATSHEETS --- N/A
<br />PIPELINE - CONSTRUCTION NOTES
<br />L- 197A MP 10.26
<br />INSTALL 200' DEEP WELL ANODE
<br />ACAMPO, CALIFORNIA
<br />PACIFIC GAS AND ELERRIC COMPANY
<br />SAN FRANCISCO, CALIFORNIA
<br />f
<br />B
<br />GASIRANSMISSIDN
<br />ESTIMATING & DESIGN
<br />A,�
<br />.R. -
<br />C -720---
<br />31179016
<br />-72031179016 1 0 .
<br />10 n
<br />
|