SUMMARY OF PROPOSED WORK: <br />1. INSTALL 200' DEEP WELL ANODE, <br />2.BORE CONDUITS ACCROSS E ORCHARDRD. <br />3. INSTALL CTS STATION, OFF SET TEST HEAD TO INSIDE CABINET. <br />4. INSTALL CABINET WITH RECTIFIER, NO, WATCHDOG AMU, AND <br />E ACOISCONNECT. <br />S. INSTALL AC DISCONNECT ON POLE. <br />S. INSTALL 2 GROUND RODS. <br />7. TRENCHANO RACKFILL. <br />SEQUENCE OF OPERATIONS: <br />1. FOLLOW ALL CLEARANCE PROCEDURE. <br />2. INSTALL DEEP WELLANODE. <br />3. INSTALL CABINET WITH RECTI FNA, AMU, Na, <br />ACDISCONNECT. <br />4. CONTACT CORROSION MECHANIC PRIOR TO PUTTING <br />INTOSERVICE <br />5. RESTORE SITE TO ORIGINAL CONDITION. <br />C <br />1 1 z <br />CONSTRUCTION NOTES: <br />GENERAL REQUIREMENTS: <br />1. UNDERGROUND SERVICE ALERT: <br />CALL -800227-2600) A MINIMUM OF 2 BUSINESS DAYS INOT INCLUDING INITIALDAY OF <br />CONT811 IIN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, INCLUDING ALL <br />NON -UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE. <br />2, UTILITY NOTES. <br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION <br />FROM SEVE HAL SOURCES, AND SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL <br />PRIOR TO FABRICATION. <br />B. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF <br />UNDERGROUND UTILITIES, PROPERTY LINES, AND OTHER SUBSTRUCTURES IS NOT GUARANTEED <br />TO BE ACCURATE OR ALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTKONPERSONWL <br />ARE RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE AND LOCATION OF <br />UNDERGROUND UTILITIES AND OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR <br />ENCROACHMENTS. <br />C. PROSPECTING IS REQUIREDAHEAD OF WORK. ALL OFFSETS OR ROPING WILL NEED TO BE <br />AVPROVED BY THE PG&E PROJECT ENGINEER (PEO), AND RECLINED DETAILS SHOWN ON PBOFIIE <br />AND CONSTRUCTION DETAIL SHEETS OF EACH ADDITIONAL SUBSTRUCTURE. <br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT <br />DIG METHODS (.B. VACUUM EXCAVATIONS OR SIMILAR). <br />3. ELBOWS AND FIELD BENDS: <br />A. ALL BENDS ARE SMOOTH FIELD BENDS, EXCEPT WHERE ELBOWS ARE SHOWN. FIELD BENDS <br />SHALL BE MADE INACCORDANCE WITH A-36, SECTION 4D. FIELD BENDS MAY BE USED IN 11EU <br />OF ELBOWS WHEN <br />PREAPPROVED BY THE PG&E PROJECT ENGINEER (RED). <br />B. IN ORDER TO AVOID EXCESSIVE STRAIN ON THE PIPELINE. THERE SHALL BE A MINIMUM <br />SEPARATION OF 5 FEC BETWEEN A ROPED SECTION Of PIPELINE AND ANY ELBOWS OR FIELD <br />BENDS. <br />C. AULANGLES SHOWN IN THE PLAN AND PROFILE ARE APPROXIMATE AND SHALL BE CUT TO SUIT <br />FIELD CONDITIONS. <br />4. SEPARATION FROM OTHER STRUCTURES: <br />A. CROSSING UNDERGROUND FACILITIES: PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST <br />24 INCHES OF CLEARANCE FROM ANY OTHER SUBSTRUCTURE/UDIITY NOTASSOCIATED WITH <br />THE PIPELINE UNLESS NOTED ON THE DRAWINGS. <br />B. PARALLELING UNDERGROUND FACILITIES: THIS PIPELINE MUST BE INSTALLED WITH AT LEAST <br />5 FEET OF CLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED <br />WITH THE PIPELINE UNLESS NOTED ON THE DRAWINGS. <br />S. RESTORATION AND CLEAN UP: <br />A. RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC ABOVE PIPE BEDDING SHALL BE IN <br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS. <br />B. WHERE EVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12' AND <br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED. <br />TARE CARE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL. <br />6. DESIGN NOTES: <br />ATHIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS -BUILT DRAWINGS & RECORDS. <br />ACCURACY IS DEPENDENT UPON THE SOURCE DOCUMENT LISTED ON THE REFERENCE <br />DRAWINGS. <br />7. WE LOING REQUIREMENTS: <br />A. ALLARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL <br />MAN UAL 70-4160M. ALL CANS OR SPOOLS SHALL BE A MINIMUM LENGTH OF ONE PIPE DIAMETER. <br />WHENEVER POSSIBLE. <br />B, INSTAIL TEST STATIONS WITH THERMITE WELD CONNECTION IN ACCORDANCE WITH GAS T & D <br />CORROSION CONTROL MANUAL 0.10, .10.1 AND 030.2. <br />B. WELDING: <br />WHEN INTERNAL MISALIGNMENT EXCEEDS 0.094", BACKWELD ANY GIRTH WELD WHERE THERE 15 <br />ACCESS TO THE INSIDE OF THE WELD. WHERE THERE 15 NO ACCESS TO THE INSIDE Of THE WELD, <br />MACHINE BORING OR GANGING IS REQUIRED. BACKW ELDING, GRINDING, ON BORING MUST BE <br />DONE IN ACCORDANCE WITH THE APPROPRIATE UTILITY PROCEDURE IN THE GAS WELDING CONTROL <br />MANUAL T.4161FM. <br />9. STRENGTH TEST REQUIREMENTS <br />A. STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD <br />A 34 AND SHALL BE CONDUCTED IN ACCORDANCE WITH UTILITY PROCEDURE TD 41375. <br />0. ALL WEIRS THAT HAVE NOT BEEN STRENGTH TESTED AND ALL FITTINGS SHALL BE SOAP TESTED AT <br />100 PSI AND AT OPERATING PRESSURE BEFORE COATING CAN OCCUR. <br />10. PAINTING AND COATING REQUIREMENTS: <br />A. ALL E%POSED PIPE AND FITTINGS ARE TO BE PAINTED IN ACCORDANCE WITH GAS STANDARD <br />E-30. ALL COATING ON BURIED PIPE AND FFFHNGS ARE TORE APPLIED IN ACCORDANCE WITH <br />GAS STANDARD E-35. <br />B. FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE. <br />Il. INSPECTION OF EXISTING PIPFLINE: <br />A. WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING <br />CONSTRUCTION, FOLLOW TO.51009-01 TO DOCUMENT PIPE INSPECTION. THIS APPLIES TO EXISTING <br />AND TO BE RETIRED FACILITIES. <br />B. EXISTING GIRTH WELDS, AT TIE IN LOCATIONS, SHALL BE IDENTIFIED AND REMOVED IF PRACTICAL. <br />C. PRIOR TO TIE-IN, INSPECT COATING AND PIPE FOR DEFECTS. IF AFFECTS ARE FOUND, <br />CONTACT PED FOR GUIDANCE. <br />12. TIE-IN AND CLEARANCE PROCEDURE TO BE PREPARED AND PERFORMED IN ACCORDANCE WITH <br />THE FOLLOWING WORK PROCEDURES: <br />A. ID41W 01, HOT AND COLO WORK METHODS FOR NATURAL GAS TRANSMISSION PIPEUNE <br />SHUTDOWN AND TIE-IN. <br />& TOA441% CTAS CLEARANCE PRMFMIRFS FON FACII ITII S OPFRATINF. OVER 60 PUG <br />K""NIIeI'F DBIOW. <br />CAI(1161- YOU RIO. <br />13. COATINGREMOVAL: <br />A PERFORM THE FOLLOWING STEPS, IN ACCORDANCE WITH TD -4731P 01, BEFORE REMOVING <br />ASPHALTIC PIPE WRAP ON PIPEUNES INSTALLED PRIOR TO 1972 (BASED ON PG&E ANALYSIS, <br />PIPE INSTALLED IN 1972 OR LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOSI: <br />1. REFER TO THE 'EXISTING PIPE SPECS (PRE -1972)' STAMP TO DETERMINE IF A SAMPLE HAS <br />BEEN COLLECTED OR IF A SAMPLE IS REQUIRED. <br />a. 'YES" REPRESENTS HISTORICAL RESULTS ARE AVAILABLE SHOWING THAT PIPE WRAP <br />CONTAINSASBESTOS. NO SAMPLE 15 REQUIRED. <br />b. "NO' REPRESENTS HISTORICAL RESULTS ARE AVAILABLE AND THE PIPE WRAP DOES NOT <br />CONTAIN ASBESTOS (CONTENT WAS NON DETECT). NO SAMPLE IS REQUIRED. <br />c "UNKNOWN' REPRESENTS NO HISTORICAL RESULTS ARE AVAILABLE. A SAMPLE IS <br />REQUIRED N THE PIPE INSTALLATION DATE IS PRIOR TO 1972. <br />2. WHEN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASBESTOS: <br />a. COLLECT SAMPLE PER 1.4711P-01 AND COMPLETE CHAIN OF CUSTODY FORM <br />TO4711P.01401. <br />b. FILE PINK COPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS <br />WON THE Ai-RUILTS. <br />3. WHENREMOVINGPIPE WRAP THAT CONTAINSASBESTOS, OR FOR EMERGENCY WORK, <br />FOLLOW TD -4711P-01 "PIPE WRAP REMOVAL, HANDLING AND DISPOSAL". <br />CATHODIC PROTECTION NOTES: <br />1. FOILOWTO5l".Ol TO DOCUMENT INTERNAL CORROSION AND EXTERNALCORROSION <br />INSPECTION OF THE PIPELINE. <br />2. UPON COMPLETION OF BORINGS, CONTACT THE CORROSION SUPERVISOR FOR THE LOCAL <br />AREA/DIVISION TO PERFORM CURRENT DRAIN TESTS ON THE PIPELINE SEGMENT THAT <br />WAS INSTALLED IN THE BORE. THE CURRENT DRAIN TEST MUST BE PF RFORMED PRIOR TO <br />WELDING PIPE ON EITHER SIDE OF THE BORE. <br />3. FOR THE INSTALLATION OF THE OMNIMETRIK RECTIFIER REMOTE MONITOR, CONTACT THE <br />CORROSION SUPERVISOR FOR THE LOCAL ARENDIVISION. <br />4. BONDING CABLES TO BE INSTALLED ACROSS PIPELINE CUT-OUTS AT ALL LOCATIONS THE <br />PIPELINE IS SEVERED PRIOR TO REMOVAL CHAIN CLAMPS, MAGNETIC CLAMPS, OR OTHER <br />CONSTRUCTION MANAGEMENT APPROVED CLAMPS AND R6 IMIN) STRANDED CABLE SHALL <br />REUTILIZED. CLAMPS TO REMAIN IN PLACE UNTIL PIPELINE IS TIED IN, <br />RETIREMENT PROCEDURE FOR EXISTING PIPE: <br />1. GT&D UTILITY WORK PROCEDURE TD 950OP-16,'DEACIVATION AND/OR RETIREMENT OF <br />UNDERGROUND GAS FACILN'IES," SHALL BE FOLLOWED. <br />2. THE EXISTING PI PE SECTIONS$HAL L HAVE FREE LIQUIDS REMOVED AN D BE LOOK PURGED <br />PER GAS DESIGN STANDARD A-38, 'PROCEDURES FOR PURGING GAS FACILITIES.' <br />3. THE PIPE SHALL BE SECTIONALIZED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN. <br />THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO <br />IDENTIFY THE MOST OPTIMUM LOCATION IN THAT VICINITY. ACCURATE SURVEY DATA MAY <br />NOT BE AVAILABLE FOR THESE LOCATIONS SOUSE CAUTION DURING EXCAVATION AND WHEN <br />IDENTIFYING THE PIPELINE TO BE RETIRED. OTHER ACTIVE PIPELINES MAY BE IN THE AREA. <br />4. AT EACH SUCH LOCATION NOTED ABOVE. ANECE OF PIPE AT LEAST 24' LONG SHALL BE <br />REMOVED. INSTALL A 1" HIGH PRESSURE SAVE -A -VALVE IH 17491, MD22287) TO CHECK FOR <br />PRODUCTAND PRESSURE PRIOR TO CUTTING INTO THE PIPELINE THE OPEN ENDS OF THE <br />RETIRED PIPE SHALL BE SEALED BY THE MOST APPROPRIATE METHOD OUTLINED IN GT&D <br />UTIUTY WORK PROCEDURE T.9500P46. BACKFILL MUST BE THOROUGHLY COMPACTED IN <br />PLACE OF THE REMOVED SECTION OF PIPE. <br />DESIGN CHANGE PROCEDURE <br />MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT <br />ENGINEER (PED) BEFORE MAKING ANY DESIGN CHANGE TO GAS FACILITIES PER TD4014P-01. <br />6 I 7 <br />9 1 10 <br />CONTACT INFORMATION: <br />PROJECT MANAGER <br />---- BPENT MAEOA <br />925-1139348 <br />CORROSION ENGINEER <br />--- ARE <br />WOOD925.2BS-7838 <br />ESTIMATOR/DESIGNER <br />FIELD ENGINEER/CM <br />- MATTGOODWIN <br />--- T <br />0371-3 69 8 <br />209- 7 <br />TBD <br />[AND PLANNER <br />---- TBD <br />TBD <br />LOCAL CORROSION <br />MECHANIC <br />-- TBD <br />TBD <br />REFERENCE DRAWINGS: <br />OPERATING MAPS .. - . N/A <br />OPERATING DIAGRAMS --.r N/A <br />PLATSHEETS --- N/A <br />PIPELINE - CONSTRUCTION NOTES <br />L- 197A MP 10.26 <br />INSTALL 200' DEEP WELL ANODE <br />ACAMPO, CALIFORNIA <br />PACIFIC GAS AND ELERRIC COMPANY <br />SAN FRANCISCO, CALIFORNIA <br />f <br />B <br />GASIRANSMISSIDN <br />ESTIMATING & DESIGN <br />A,� <br />.R. - <br />C -720--- <br />31179016 <br />-72031179016 1 0 . <br />10 n <br />