Laserfiche WebLink
r <br /> September 16, 1988 <br /> DECONTAMINATION <br /> The drilling steel will be steam cleaned prior to arriving on- <br /> site. The steel will also be steam cleaned between destruction <br /> of the two wells. The material removed from the wellbores will <br /> remain on site to be treated and/or aerated with the soil to be <br /> excavated. The drilling contractor will properly dispose of the <br /> PVC casing removed from the wellbores. <br /> Approved by <br /> Mardo Kaprealian <br /> President <br />