Laserfiche WebLink
LLNL Emergency Plan <br />Rev-22 <br />January 2017 <br /> <br /> 13 <br />The Laboratory staff consists of approximately 5,700 Career employees as of January 1, 2016. <br />Flex term, Post-Doc, Non-Career, and Supplemental Labor bring the Laboratory population to <br />around 6,900. <br />LLNL is comprised of two non-contiguous sites – Site 200 and Site 300. The Livermore site is <br />located on a one-square-mile site in Livermore, CA (Site 200). A larger (approximately <br />11 square mile/7,000 acres) remote explosives/experimental testing site (Site 300) is situated <br />18 miles to the east with an approximate population of 200. (See Figure 1.1.) <br /> <br /> <br />Figure 1.1 Local Area <br /> <br />Infrastructure Overview <br />Site 200: (approximate figures – December 2016) <br /> 532 Facilities <br />185 Permanent Buildings <br />86 Modulars/Prefabrications <br />89 Trailers <br />32 Tents <br />71 Utility or Other structures <br />53 Infrastructure (roads, sewer, etc.) <br />16 World War II Era Buildings <br />  6.8 million gross square feet <br />Site 300: (approximate figures – December 2016) <br /> 217 Facilities <br />92 Permanent Buildings <br />26 Modulars/Prefabrications <br />5 Trailers <br />30 Utilities or Other structures <br />26 Infrastructure (roads, sewer, etc.) <br />38 Bunkers/Vaults <br />  392,000 gross square feet