Laserfiche WebLink
Inspection Item: Status: If(*),is item important to Comments,Including <br /> tank or containment Follow-upAction taken <br /> integrity?(Y/N) (Work Oder#,etc.) <br /> 4.4 Check the condition of the spill containment boxes <br /> on fill pipes <br /> a. Is corrosion,damage or wear present that ❑Yes* <br /> compromises the ability of the unit to perform ❑No <br /> spill containment functions. X NA <br /> b. Are connections to the container tight? ❑Yes <br /> ❑No* <br /> 4 NA <br /> C. Are drain valves operable and closed? ❑Yes <br /> ❑No* <br /> X NA <br /> 4.5 Filters <br /> a. Is the filter is in good condition and within the ❑Yes <br /> manufacturer's expected service life?Replace, ❑No* <br /> _ if necessary. X NA <br /> b. Are leaks or decreased fuel flow present? ❑Yes* <br /> ❑No <br /> ¢4 NA <br /> 4.6 Liquid Level Equipment <br /> a. Is the tank liquid level gauge operable(record 9 Yes V--- <br /> tank level in comments)? ❑No* <br /> ❑NA <br /> b. Has level gauge been calibrated or checked D Yes <br /> consistent with the manufacturer's ❑No* <br /> recommendations? PC NA <br /> C. Test the high level alarm.Does equipment ❑Yes <br /> operate as required? ❑No* <br /> [N NA <br /> 5.0 Miscellaneous <br /> 5.1 Are electrical wiring and boxes in good f Yes <br /> condition? ❑No* <br /> X NA <br /> 5.2 Are labels and tags intact and readable? 56 Yes <br /> ❑No* <br /> ❑NA <br /> 5.3 Are there other conditions that should be D Yes* <br /> addressed for continued safe operation or that 5d No <br /> may affect the site SPCC Plan? <br /> COMMENTS: cj S 6Aj LarS <br /> Signature: Date: / Z-7 Ile <br />