Laserfiche WebLink
7/5/2018 Hazardous Waste Generator Regulatory Summary I Hazardous Waste Generators I US EPA <br /> Very Small Small Large <br /> Requirement Quantity Quantity Quantity <br /> Generators Generators Generators <br /> <100 <br /> kg/month, and >1,000 <br /> Quantity Limits <1 kg/month kg/month, or <br /> The amount of of acute >1 kg/month of <br /> hazardous waste hazardous >100 and<1,000 acute hazardous <br /> generated per month waste, and kg/month waste, or <br /> determines how a <100 >100 kg/month <br /> generator is categorized kg/month of §260.10 of acute spill <br /> and what regulations acute spill residue or soil <br /> must be complied with. residue or soil <br /> §260.10 <br /> §260.10 <br /> EPA ID Number <br /> Acquire a unique EPA Required Required <br /> identification number Not required <br /> that identifies generators §262.18 §262.18 <br /> by site. <br /> <1,000 kg or <br /> On-Site Accumulation <br /> <1 kg acute <br /> Quantity hazardous <br /> Determine amount of Waste or<100 kg of <6,000 kg <br /> hazardous waste No limit <br /> generators are allowed acute spill §262.16(b)(1) <br /> to "accumulate" on site residue or soil <br /> without a permit. §§262.14(a) <br /> (3) and (4) <br /> Accumulation Time <180 days or <br /> <270 days (if <br /> Limits <br /> Determine amount of transporting <_90 days time hazardous waste is None greater than 200 <br /> allowed to accumulate miles) §262.17(a) <br /> on site. <br /> https://www.epa.gov/hwgenerators/hazardous-waste-generator-regulatory-summary#table 2/6 <br />