Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br />RECEIVED <br />INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): <br />cn. <br />H 1. VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑� 3. TELEPHONr 2 1 2018 <br />[14. PAGERS; ❑ 5. ALARM SYSTEM; [16. PORTABLE 10 <br />NOTIFICATIONS TO NEIGHBORING FACE.ITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL (�f�[N <br />ctz <br />IIiL� <br />❑ 1. VERBAL WARNINGS; [12. PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑ 3. TEI.E ISERV!CES <br />❑ 4. PAGERS; ❑ 5. ALARM SYSTEM; ❑ 6. PORTABL <br />EMERGENCY COORDINATOR CONTACT INFORMATION: <br />C13. <br />PRIMARY EMERGENCY COORDINATOR NAME: ASHISH BOVEJA PHONE NO.: (209) 547-1700 PHONE NO.: <br />ALTERNATE EMERGENCY COORDINATOR NAME: DAVEN LOOMBA PHONE NO.: (408) 839-8115 PHONE NO.: <br />❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br />Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br />D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br />Check the applicable boxes to indicate you facility's procedures for containing spills and preventing and mitigating releases fires and/or explosions. <br />DI. <br />❑ L MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; <br />[12. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br />❑� 3. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spit pillows); <br />❑ 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br />❑ 5. LINED TRENCH DRAINS AND/OR SUMPS; <br />[:16. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br />7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br />[18. STOP PROCESSES AND/OR OPERATIONS; <br />❑� 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br />❑ 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br />0 11. CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br />El 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br />❑ 13. ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br />❑ 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br />❑� 15. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br />[-116. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br />❑E 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br />❑ 18. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br />❑ 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE, <br />[120. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br />❑ 21.OTHER (Specify): <br />Da. <br />E. FACILITY EVACUATION <br />THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): <br />In. <br />❑� 1. BELLS; <br />Et. <br />❑ 2. HORNS/SIRENS; <br />Q 3. VERBAL (i.e., Shouting); <br />❑ 4. OTHERS c' <br />THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g., Parking lot, street comer): <br />m. <br />NEXT TO DRIVEWAY ON D STREET <br />Note: The Finergency EmergencyCoordinator must account for all onsite em to ces and visitors after evacuation. <br />EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br />❑ 1. WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />❑� 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />❑ 3. OTHER (Specify): ss. <br />Note: Evacuation procedures and/or maps should be posted in visible facility locations and most be included in the Contingency Plan. <br />F. ARRANGEMENTS FOR EMERGENCY SERVICES <br />ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): <br />Fl. <br />[F] 1. HAVE BEEN DETERMINED NOT NECESSARY; <br />❑ 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br />Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br />contractors should be made for your facility, if necessary. Large Quantity Generators most describe arrangements in the Contingency Plan. <br />Rev. 03/07/17 Page 2 of 4 <br />