My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
3131
>
1900 - Hazardous Materials Program
>
PR0521094
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 10:48:43 AM
Creation date
6/9/2018 8:28:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0521094
PE
1921
FACILITY_ID
FA0005249
FACILITY_NAME
VALLEY FORKLIFT
STREET_NUMBER
3131
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14322014
CURRENT_STATUS
01
SITE_LOCATION
3131 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\3131\PR0521094\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
3/7/2016 4:53:15 PM
QuestysRecordID
2998087
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W _&UNTY HAZAi..iOUS MATERIALS MANAGEMENT r„A� SIDE 2 <br /> i`lAY 15 2001 SPILL CONTROL PROCEDURES SECTION <br /> SPIL 'r ( l(NADER02) <br /> Lit Nlt� ���.areas or <br /> s stems vulnerable to earthquakes) <br /> THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> �ir7,ri -- <br /> AUTHORIZED SPILL CONTROL STRATEGIES(14) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials on its <br /> property. Persons performing these tasks will possess written procedures for performing them and will have received training on the <br /> procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br /> minimum our business must isolate the area of the spill and make notifications. <br /> Spills of Liquid Materials <br /> Plug and Patch Container ❑ Neutralize Spilled Material <br /> ❑ Build Retention Dike ❑ Secure System Valves and Closures <br /> �❑X Remove Sources of Ignition ❑ Shutdown System Involved <br /> IXI Position Container so as to Stop Leak ❑ Apply Absorbent Material to Spill Area <br /> ✓❑'� Reduce Pressure in Container/System ❑ <br /> ❑ Isolate Area and Make Notifications <br /> ....�,,,��----R\����e((((lease of Compressed Gases Spills of Solid or Powder Materials <br /> Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water Place Spilled Material into Drum or Bag <br /> ❑ Isolate Area and Make Notifications ❑ Isolate Area and Make Notification <br /> ❑ Remove Sources of Ignition ❑ <br /> AUTHORIZED CLEANUP COMPANIES SECTION (15) <br /> The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br /> materials spill. <br /> NAME 2'4-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> NAWE 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> Gly SJC 12/00 <br /> a�74 3 (ob'— 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.