My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
1900 - Hazardous Materials Program
>
PR0520679
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 10:52:00 AM
Creation date
6/9/2018 9:12:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0520679
PE
1919
FACILITY_ID
FA0007575
FACILITY_NAME
TACO BELL #19206
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
01
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
JCastaneda
Supplemental fields
FilePath
\MIGRATIONS\H\HARDING\45\PR0520679\COMPLIANCE INFO 2017-PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2017-PRESENT
QuestysRecordDate
3/7/2018 9:46:22 PM
QuestysRecordID
3821870
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HA7 'I- US MATERIALS MANAGEMEN" 'I I <br /> s fr;SPILL CONTROL PROCEDURES SECTION <br /> I NOV 1 <br /> SPILL CONTROL LEADER(11) <br /> -h J:i.-..S,.u. ,.. <br /> OFFl�E OF �a`rt'/ICE$ <br /> THE FOLLOWING INDNIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL <br /> AUTHORIZED SPILL CONTROL STRATEGIES (13) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials on its <br /> property. Persons performing these tasks will possess written procedures for performing them and will have received training on the <br /> procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br /> minimum our business must isolate the area of the spill and make notifications <br /> Spills of Liquid Materials <br /> ❑ Plug and Patch Container ❑ Neutralize Spilled Material <br /> ❑ Build Retention Dike ❑ Secure System Valves and Closures <br /> ❑ Remove Sources of Ignition ❑ Shut Down System Involved <br /> ❑ Position Container so as to Stop Leak ❑ Apply Absorbent Material to Spill Area <br /> ❑ Reduce Pressure in Container/System ❑ <br /> ❑ Isolate Area and Make Notifications <br /> Release of Compressed Gases Spills of Solid or Powder Materials <br /> ❑ Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release ❑ Neutralize Spilled Material <br /> ❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br /> ❑ Isolate Area and Make Notifications ❑ Isolate Area and Make Notification <br /> ❑ Remove Sources of Ignition ❑ <br /> AUTHORIZED CLEANUP COMPANIES SECTION <br /> The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br /> materials spill. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> SIC 12/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.