My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
4303
>
1900 - Hazardous Materials Program
>
PR0526493
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2022 3:26:08 PM
Creation date
6/10/2018 12:52:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0526493
PE
1921
FACILITY_ID
FA0017934
FACILITY_NAME
Univar USA Inc.
STREET_NUMBER
4303
STREET_NAME
MCKINLEY
STREET_TYPE
Ave
City
Stockton
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
4303 McKinley Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MCKINLEY\4303\PR0526493\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/7/2015 10:46:05 PM
QuestysRecordID
2885907
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
462t <br />koi UnIVAR UNIVAR USA INC. <br />CONTINGENCY PLAN <br />06/14/11 Replaces 03/10/10 <br />SECTION <br /> <br />SUBJECT PAGE 6 <br />THREE <br /> <br />BRANCH SAFETY ORAGANIZATION OF 10 <br />6. ASSEMBLY POINT LEADER(S) <br />Assembly Point Leader(s) will be identified for all areas of a branch -- i.e. the office, the <br />warehouse, and the repack areas. It is their responsibility to: <br />Turn off the main electrical power switch in the building for which they have <br />responsibility. <br />Close doors and windows if there is time to do so safely. <br />Proceed directly to the assembly area(s) as outlined in the evacuation plan. <br />Account for all personnel assigned to their area and report any absences to the <br />Emergency Coordinator. Ensure contractors onsite are accounted for. <br />Keep personnel in assembly area calm and together. <br />Coordinate with the First Aid Team Leader(s) and the Emergency Coordinator as <br />appropriate.
The URL can be used to link to this page
Your browser does not support the video tag.