Laserfiche WebLink
November 21, 2016 <br />To: Nicholas Loehrer <br />Re: Farmington Fresh Hazardous Materials On -Site Inspection Report <br />Nicholas, <br />Attached below is description of our activities in response to your inspection report. <br />Areas of Concern Corrective Actions Response <br />1) Leaking 5 gal bucket of in the bone yard. <br />Action: We removed the oil for waste disposal, and removed the soil around the bucket, the soil is <br />in 55 gal drums awaiting further testing and removal from site. <br />2) Discoloration in dirt at culls area. <br />Action: We have an open internal corrective action previously to address the cull bin apple juice <br />that is causing the discoloration of the dirt ditch. During our management meeting held week of <br />11/21 we are consulting outside contractors to bid on creating a cement surrounding area for the <br />storage and holding the bins to container the apple juice and allow routine clean-up. Reference <br />attachment 1 pdf Corrective Action 047. <br />3) Full containers in the empty storage containers storage area. <br />Action: Currently we are moving and checking each individual container from the area with <br />labeling, serrating empties from one that have liquid within them. We are finding the <br />liquid inside is what is labeled on the outside. Some of the containers were partial used <br />and others were just no longer used and had been placed in this location. All empty <br />containers are being removed. <br />