My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERLMAN
>
3656
>
1900 - Hazardous Materials Program
>
PR0520626
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 3:24:59 PM
Creation date
6/11/2018 8:49:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0520626
PE
1920
FACILITY_ID
FA0011040
FACILITY_NAME
PRISM TEAM SVCS OF THE VALLEY
STREET_NUMBER
3656
STREET_NAME
PERLMAN
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17727031
CURRENT_STATUS
01
SITE_LOCATION
3656 PERLMAN DR
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\P\PERLMAN\3656\PR0520626\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/25/2016 9:57:17 PM
QuestysRecordID
2922174
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HAZARD US MATERIALS MANAGEMENT PL PAGE 2 <br /> SPILL CONTROL PROCEDURES SECTION <br /> SPILL CONTROL LEADER(12) ELIAS MACIAS <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> ELIAS MACIAS <br /> WHSE SUPERVISOR <br /> MIKE MAYO <br /> PAUL VAN DE ROOVAART <br /> I AUTHORIZED SPILL CONTROL STRATEGIES(14) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials on <br /> its property. Persons performing these actions will possess written procedures for performing them and will have received training <br /> on the procedures and equipment needed. Locations of needed equipment are shown on the facility map. At a minimum our <br /> business must isolate the area of the spill and make notifications. <br /> Spills of Liquid Materials <br /> ❑Plug and Patch Container ❑Neutralize Spilled Material <br /> ❑Build Retention Dike ❑Secure System Valves and Closures <br /> ®Remove Sources of Ignition ❑ Shutdown System Involved <br /> []Position Container so as to Stop Leak ❑Apply Absorbent Material to Spill Area <br /> ®Reduce Pressure in Container/System ❑Other... <br /> ®Isolate Area and Make Notifications <br /> Release of Compressed Gases Spills of Solid or Powder Materials <br /> ❑Shut Off Valves/Systems ❑Cover Spill to Prevent Spread <br /> ❑Ventilate Area of Release ❑Neutralize Spilled Materials <br /> ❑Reduce Pressure in Container/System ❑Position Container so as to Stop Leak <br /> ❑Suppress Vapors with Water ❑Place Spilled Material into Drum or Bag <br /> ❑Isolate Area and Make Notifications ❑Isolate Area and Make Notifications <br /> ❑ Remove Sources of Ignition ❑Other... <br /> ❑Other... <br /> AUTHORIZED CLEAN-UP COMPANIES SECTION (15) <br /> These clean-up companies will be accessed in the event that our business must expend funds to clean up a hazardous materials spill. <br /> CHEMTRAC 800-424-9300 <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> VAN UNEN/MIERSMA 209-823-1315 <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> END OF FORM DATE REC'D: <br />
The URL can be used to link to this page
Your browser does not support the video tag.