Laserfiche WebLink
11 <br />RECEIVED <br />GCI -4 2010 <br />SAN JOAOUIN,�C,,��!jM� <br />5. EVACUATION oSASERVICES <br />Describe the procedures to be followed for immediate notification and evacuati <br />G, <br />EARTHQUAKES <br />Identify the areas and equipment in your business, which would require immediate inspection or <br />isolation due to their vulnerability to earthquake related ground motion. Check for equipment such <br />as gas cylinders, piping, drums, etc., that may need to be secured or spillage that may require <br />mitigation or abatement. <br />7, HAZARDOUS WASTE CONTINGENCY <br />Specific procedures for prevention, mitigation and abatement of a release of hazardous waste <br />generated at your business, This section only applies to hazardous waste generators. <br />8, UNAUTHORIZED RELEASE RESPONSE PLAN <br />Specific procedures for mitigation, abatement and reporting of an unauthorized release from an <br />ease <br />wall tank <br />system <br />storage tank <br />l� ablle. T(UShis plan should covehe plan must r the entirress a le UST system This sngle ection only <br />r a double <br />wall tank system as app • <br />applies to UST owner/operators. <br />g, SITE SECURITY <br />As applicable on an individual facility basis, you should assess the security and vulnerability of your <br />business from intentional acts both from within your business (sabotage) and from the outside <br />(vandalism and terrorist acts). This assessment should consider testing your security system and <br />procedures on a regular basis. <br />Details of this assessment should not be included in this plan as it is a public document. <br />Revised (5/03) <br />