My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROBINHOOD
>
1025
>
1900 - Hazardous Materials Program
>
PR0520721
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:00:36 PM
Creation date
6/11/2018 5:25:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0520721
PE
1919
FACILITY_ID
FA0001056
FACILITY_NAME
HOMETOWN BUFFET #707
STREET_NUMBER
1025
Direction
W
STREET_NAME
ROBINHOOD
STREET_TYPE
DR
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
1025 W ROBINHOOD DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\R\ROBINHOOD\1025\PR0520721\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
11/2/2016 3:41:19 PM
QuestysRecordID
3247643
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />MATERIALS MANAGEMENT <br />SPILL CONTROL PROCEDURES SECTION <br />SPILL CONTROL LEADER (12) NLA S E 'y k( j) A T y� M L <br />(also oversees inspections of areas or <br />systems vulnerable to earthquakes) <br />THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br />SIDE 2 <br />AUTHORIZED SPILL CONTROL STRATEGIES (14) <br />This business has authorized the above personnel to perform the action(s) indicated below to control spills of hazardous materials on its <br />property. Persons performing these tasks will possess written procedures for performing them and will have received training on the <br />procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br />minimum our business must isolate the area of the spill and make notifications. <br />Spills of Liquid Materials <br />❑ Plug and Patch Container <br />❑ Build Retention Dike <br />❑ Remove Sources of Ignition <br />❑ Position Container so as to Stop Leak <br />❑ Reduce Pressure in Container/System <br />❑ Isolate Area and Make Notifications <br />Release of Compressed Gases <br />❑ Shut Off Valves/Systems <br />❑ Ventilate Area of Release <br />❑ Reduce Pressure in Container/System <br />❑S ress Vapors with Water <br />Isolate Area and Make Notifications <br />❑ Remove Sources of Ignition <br />❑ Neutralize Spilled Material <br />❑ Secure System Valves and Closures <br />❑ Shutdown System Involved <br />❑ Apply Absorbent Material to Spill Area <br />❑ul <br />Spills of Solid or Powder Materials <br />❑ Cover Spill to Prevent Spread <br />❑ Neutralize Spilled Materials <br />❑ Position Container so as to Stop Leak <br />❑ Place Spilled Material into Drum or Bag <br />❑ Isolate Area and Make Notification <br />The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br />materials spill. <br />+(A,Z A yZn WS MRTE AL -S N WD I fJ (� GU P cam pp't4 `I <br />NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br />9—+97- 2-4Z-7 1a? <br />NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br />SIC 12/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.