My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
7701
>
1900 - Hazardous Materials Program
>
PR0519704
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2024 11:32:19 AM
Creation date
6/11/2018 6:05:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0519704
PE
1921
FACILITY_ID
FA0004050
FACILITY_NAME
U-Haul Moving & Storage at Hammertown
STREET_NUMBER
7701
STREET_NAME
TAM O SHANTER
City
STOCKTON
Zip
95210
APN
094-030-24
CURRENT_STATUS
01
SITE_LOCATION
7701 TAM O SHANTER
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\T\TAM O'SHANTER\7701\PR0519704\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
12/22/2016 12:28:26 AM
QuestysRecordID
3287304
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT VAN SIDE 2 <br /> SPILL CONTROL PROCEDURES SECTION <br /> SPILL CONTROL LEADER(12) <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) RECEIVED <br /> THE FOLLOWING INDIVIDUALSIPOSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> 8ANJ0A0UlY G0MTy <br /> OFt'CEOFEME9GE114CYSERIACES <br /> AUTHORIZED SPILL CONTROL STRATEGIES (14) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials on its <br /> property. Persons performing these tasks will possess written procedures for performing them and will have received training on the <br /> procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br /> minimum our business must isolate the area of the spill and make notifications. <br /> Spills of Liquid Materials <br /> ❑ Plug and Patch Container ❑ Neutralize Spilled Material <br /> ❑ Build Retention Dike ❑ Secure System Valves and Closures <br /> ❑ Remove Sources of Ignition ❑ Shutdown System Involved <br /> ❑ Position Container so as to Stop Leak ❑ Apply Absorbent Material to Spill Area <br /> ❑ Reduce Pressure in Container/System ❑ <br /> ❑ Isolate Area and Make Notifications <br /> Release of Compressed Gases Spills of Solid or Powder Materials <br /> ❑ Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br /> ❑ Isolate Area and Make Notifications ❑ Isolate Area and Make Notification <br /> ❑ Remove Sources of Ignition ❑ <br /> t <br /> AUTHORIZED CLEANUP COMPANIES SECTION (15) <br /> The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br /> materials spill. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> SIC 12/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.