Laserfiche WebLink
INN-02-2002 13:21 801 334 4774 P.03i05 <br /> .o•<uai iv:to royuooea-�+ FIF"r FLQQR • PAGE 03 <br /> RECEIVED <br /> JAN 0 2 20OZ <br /> EMERGENC i JOAl1UINCUl1NTV <br /> UNDERGRouu M STORAGE TANK MOIN7iuRaiG FROGR�0FEpGENcysEAvlcEs <br /> T`s moru'torsng program mus:be kept at the UST location at all times. The information on this moaitnriag <br /> program ate canditiotLt of Me operauag permlc The Perini[holder must aoufy San 7otquin County <br /> EzMrg=e,1M1 H--4%t DivisioL phoce (269) 468-3420 Within �0 days of any manges to the monitO&g <br /> procedures,unless required to obtain approval before mn:c the chanfa- <br /> Required by Secdow 26:2(4)an4 2641^[) CC-& <br /> Facility Name_ rZ'"ING v TR:y✓ Z <br /> Facility Address 15100 Thornton Road Lodi a 95242 <br /> 1. If an unauthorized release occurs, now will the hazardous substance be cleaned up? <br /> Note: If released "hazardous substances reach the eavirormr04 inzrease the firepr <br /> explosion Lazard,are not cleaned up from the secondary caatainment'W1thiu 8 Lours, <br /> or deteriorate the secondary containment, then San Joaquin County-r,nviroRmeatal <br /> Realth bivisiou must be uotiFed within 7.4 hours: <br /> All gpillnL A tlu t nEo - <br /> liee4rrc�ltaie-�rp Vleangri un wi.Yh aU o� atAriat and <br /> — <br /> and contracred LOOE reemovaL to <br /> 2. Describe the proposed methods and equiprssent to be used for removing and properly <br /> disnosine of anti• hazardous substances: <br /> APT npprrrrP,4 ni I �h F ,fat siva <br /> tly� ar., r•_ntaineA is al,nri trnuqbd 3,11 ntnd +., ntl /...oto aparato_'. <br /> away <br /> by registered haznat company. <br /> 3. Desonbe the location and availability of the required cleanup equipment i* teM, 2 <br /> above: <br /> Oil water separatgr is loc ted near the tank farm <br /> Spill kits are located on the fuel islands <br /> 4. Descmbe the maintenance schedule for the cleanup equipment <br /> 11bnthl safety meetings Monthly irventory semimonthly dispog-ml sick up <br /> 5. List the names) and titles) of the person(s) responsible for authorizing any work <br /> necessary under the response plan: <br /> Todd YeibPli ni strict #1 ManaaPr <br /> 4-j/ <br />