My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAL DERVIN
>
265
>
1900 - Hazardous Materials Program
>
PR0520123
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 11:25:35 AM
Creation date
6/12/2018 8:18:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0520123
PE
1921
FACILITY_ID
FA0010179
FACILITY_NAME
TEICHERT CONST
STREET_NUMBER
265
Direction
(none)
STREET_NAME
VAL DERVIN
STREET_TYPE
PKWY
City
STOCKTON
Zip
95206
APN
19341008
CURRENT_STATUS
Active, billable
SITE_LOCATION
265 VAL DERVIN PKWY
P_LOCATION
01
P_DISTRICT
001
Supplemental fields
FilePath
\MIGRATIONS\V\VAL DERVIN\265\PR0520123\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
12/16/2017 12:35:27 AM
QuestysRecordID
3748988
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAZARDOUS WASTE CONTINGENCY PLAN <br />For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br />Authority Cited.- Title 22, California Code of Regulations (CCR) §66265.52 as referenced by §66262.34(a)(4) or 67450.3(c)(9)(C) <br />Facilities that generate 1,000 kilograms or more of hazardous waste per month, or accumulate more than 6,000 <br />kilograms of hazardous waste on-site at any one time, must prepare a Contingency Plan. Facilities that generate <br />in any month more than 1 kilogram of acutely hazardous waste (AHW), or more than 100 kilograms of debris <br />resulting from the spill of an AHW, or which treat hazardous waste onsite under the Permit by Rule (PBR) <br />onsite treatment tier must also prepare a Contingency Plan. Many facilities that are required to prepare a <br />Contingency Plan are already subject to Hazardous Materials Business Plan (HMBP) reporting requirements due <br />to the quantities of hazardous materials/wastes they have onsite. If you have already prepared a Unidocs <br />HMBP, or already have a plan which is equivalent in content to the Emergency Response/Contingences <br />module of the Unidocs HMBP. you have satisfied the Contingencv Plan reauirements. and are not reauired to <br />complete the blank plan, below <br />This site-specific Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br />immediately whenever there is an imminent or actual fire, explosion, or release of hazardous waste or a <br />hazardous waste constituent which could threaten human health and/or the environment. At least one copy of <br />the plan shall be maintained at the facility for use in the event of an emergency and for inspection by the <br />local agency. A copy of the plan and any revisions must be provided to any contractor, hospital, or agency with <br />whom special (i.e., contractual) emergency services arrangements have been made (see Section E, below). <br />A. Facility Information: <br />BUSINESS NAME <br />BUSINESS PHONE. <br />A. Teichert & Son, Inc. Stockton Construction <br />209 983-2300 <br />SITE ADDRESS <br />CITY <br />ZIP CODE <br />-5 Val Dervin Parkway <br />Stockton <br />95201 <br />B. Emergency Coordinators: <br />All personnel qualified to act as the facility's Emergency Coordinator must be listed in this plan. (Note: <br />Emergency Coordinator responsibilities are described in Section F, below) If more than two people are <br />qualified, list the names, titles, business and 24-hour telephone numbers, and pager numbers of the additional <br />qualified individuals on an attached page in the order in which they will assume responsibility as alternates, then <br />check the box beneath the Emergency Coordinator information table, below, and indicate the list's page number <br />in the space provided. <br />Primary Emergency Coordinator <br />Secondary Emergency Coordinator <br />NAME <br />NAME <br />Ray Trafton <br />Robert Kirchner II <br />TITLE <br />TITLE <br />Area Superintendent <br />Safety Professional <br />BUSINESS PHONE <br />BUSINESS PHONE <br />(209) 983-2374 <br />209 678-5597 <br />2016 <br />24-HOUR PHONE <br />24-HOUR PHONE <br />(209)4 1450 <br />800) 287-7392 <br />PAGER # <br />PAGER # <br />❑ (Check box only if applicable) Additional Emergency Coordinators are listed on page of this plan. <br />C. Evacuation Plan: <br />1. The following alarm signal(s) will be used to begin evacuation of the facility (check all that apply): <br />❑ Bells; ❑ Horns/Sirens; Z Verbal (i.e., shouting); Z Other (speck Alarm System / Intercom <br />UN -017 www.unidocs.org 1/6 - Rev. 12/14/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.