My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
1900 - Hazardous Materials Program
>
PR0543518
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 10:28:35 AM
Creation date
7/30/2018 4:22:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0543518
PE
1921
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS INC
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emergency Action Plan Page 7 of 7 <br />ADDENDUM 2 Evacuation Route Maps <br /> <br />There is one Primary and one Secondary designated assembly areas at this site: <br /> Primary Evacuation Assembly Area - Located in front of the building along El Pinal Drive - near the mail boxes <br />sign at a minimum of 100' from structure <br /> If there is no feasible and safe access to the Primary Evac Assembly Area, employees are to evacuate and <br />assemble in a secondary area described below. Secondary Evac Assembly Area Located in back of the building at <br />a minimum of 100' from structure. Employees assembling to the rear of the building are to notify others, who <br />may have evacuated to the front of the building, of their location when it is safe to do. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.