My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0037488
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
27251
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0037488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 3:15:35 PM
Creation date
7/31/2018 2:09:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0037488
PE
4380
STREET_NUMBER
27251
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06721001
ENTERED_DATE
10/23/2017 12:00:00 AM
SITE_LOCATION
27251 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE OF DRAWINGS <br />1. VICINITY MAP <br />2. SCHENONE STOCK WATER SYSTEM <br />1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THESE DRAWINGS AND SPECIFICATIONS. <br />2. NO CHANGES ARE TO BE MADE TO THE DRAWINGS OR SPECIFICATIONS WITHOUT THE PRIOR APPROVAL OF <br />THE ENGINEER. <br />3. WRE PARTICIPANT SHALL BE RESPONSIBLE FOR OBTAINING ANY REQUIRED PERMITS. EASEMENTS, <br />RIGHT-OF-WAYS IN ADDITION TO MEETING ALL LEGAL REQUIREMENTS. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE AND PROTECTING ALL UTILITIES. SPECIAL SAFETY PRECAUTIONS <br />SHALL BE TAKEN WHEN WORKING IN THE VICINITY OF GAS, OIL AND ELECTRICAL LINES. <br />5. CONTACT UNDERGROUND SERVICE ALERT BY DIALING 811,48 HOURS PRIOR TO BEGINNING CONSTRUCTION <br />FOR UTILITY LOCATION SERVICES. THIS IS THE LAW PER CALIFORNIA GOVERNMENT CODE 4216. YOU MAY BE <br />FINANCIALLY RESPONSIBLE FOR DAMAGE TO UTILITIES. <br />6. Cal -OSHA SAFETY REQUIREMENTS SHALL BE IN EFFECT DURING ALL CONSTRUCTION ACTIVITIES. <br />7. A PRE -CONSTRUCTION MEETING IS REQUIRED PRIOR TO BEGINNING CONSTRUCTION. THE PARTIES WITH <br />INTEREST IN THIS PROJECT OR PROPERTY SHALL BE PRESENT INCLUDING THE CONTRACTOR. <br />8. CONSTRUCTION INSPECTIONS ARE REQUIRED THROUGHOUT THE CONSTRUCTION PROCESS. SEE THE PRACTICE <br />REQUIREMENTS FOR THE CONSTRUCTION INSPECTION SCHEDULE. <br />WATER WELL (642) <br />PUMPING PLANT, SOLAR (533C) <br />LIVESTOCK PIPELINE (516) <br />WATERING FACILITY (614) <br />ENGINEERING JOB CLASS: <br />IV <br />MAXIMUM STATIC PRESSURE ON PIPE: <br />12 PSI <br />STORAGE CAPACITY: <br />5,000 GALLONS <br />WELL PRODUCTION: <br />11 GPM <br />APPROX. _ <br />BOUNDARY r - •? <br />;! <br />Al} <br />SCHENONE WRE <br />ria F._.� <br />SIOCKWAT RSYSI L J - <br />3000 0 3000 6000 9000 <br />Scale in Feet <br />Z) <br />U <br />Z 3 <br />LTJ o <br />: o <br />LTJ <br />QV <br />W <br />LLJ <br />Z Lil ti <br />0 r o <br />LLJ <br />LLJ <br />v <br />= LTJ a <br />(n <br />Ln <br />D <br />Z <br />I— <br />LLJ <br />N <br />.c v <br />v <br />y T <br />n L U• <br />oa o <br />� V <br />1 of J <br />fi <br />
The URL can be used to link to this page
Your browser does not support the video tag.