My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2324
>
1900 - Hazardous Materials Program
>
PR0519903
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 8:52:52 AM
Creation date
8/6/2018 4:33:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0519903
PE
1921
FACILITY_ID
FA0004066
FACILITY_NAME
SCHUFF STEEL
STREET_NUMBER
2324
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16335001
CURRENT_STATUS
01
SITE_LOCATION
2324 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHUFF STEEL <br />Schuff Steel Company <br />Stockton Plant <br />FIRST SHIFT <br />PLANT EMERGENCY EVACUATION / NOTIFICATION PLAN: <br />• In the event of fire, gas leak or other condition requiring evacuation <br />from the plant, Foremen and Leadmen will be notified by hand-held <br />radios. <br />• Upon hearing the announcement to evacuate, employees are to <br />proceed to the nearest safe exit and leave the building. Foremen will <br />be posted at areas along both dirt driveways to direct employees <br />where to go. <br />After exiting the building, employees are to assemble in Area one <br />Zone 5 area a designated area depending on the circumstances of <br />the emergency. <br />o Area One is at the North West corner of the front office <br />building parking area. <br />o Area Two is at the East side in the front Yard of the plant by <br />the shop. <br />• No employee is to re-enter the building until the all clear is given by <br />the Fire Department or Schuff Steel Incident Commander. <br />PLANT AND BUILDING EVACUATION PROCEDURES: <br />The Stockton Plant has been divided into Area Department (ZONES). Each <br />ZONE will have a primary and alternate "Evacuation Monitor" to sweep the <br />area and ensure everyone is clear from that ZONE during an evacuation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.