My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
701
>
2800 - Aboveground Petroleum Storage Program
>
PR0537925
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 12:15:45 PM
Creation date
8/24/2018 6:13:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0537925
PE
2832
FACILITY_ID
FA0015755
FACILITY_NAME
Antonini Enterprises LLC
STREET_NUMBER
701
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
701 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\D\D ARCY\701\PR0537925\COMPLIANCE INFO PRE 2015.PDF
QuestysFileName
COMPLIANCE INFO PRE 2015
QuestysRecordDate
11/9/2016 5:50:13 PM
QuestysRecordID
3254178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SPILL PREVENTION CONTROL AND COUNTERMEASURE <br /> COMPLIANCE INSPECTION PLAN <br /> REVIEW PAGE <br /> In accordance with 40 CFR 112.5(b), a review and evaluation of this SPCC Plan is conducted at least <br /> once every five years. As a result of that review and evaluation, Antonini Enterprises,LLC,will amend the <br /> SPCC Plan within six(6)months of the review to include more effective prevention and control technology <br /> if(1)such technology will significantly reduce the likelihood of a spill event from the facility, and (2)If such <br /> technology has been field proven at the time of review. Any amendment to the SPCC Plan shall be <br /> certified by a Professional Engineer` within six (6) months after a change in the facility's design, <br /> construction, operation, or maintenance that materially affects the facility s potential for the discharge of oil <br /> into or upon the navigable waters of the United States or adjoining shorelines. <br /> Review Dates Signature <br /> 1. <br /> 2. <br /> 3. <br /> 4. <br /> SPCC Plan amended and certified by a Registered Professional engineer per 40 CFR 112.3(d). <br /> MANAGEMENT APPROVAL <br /> Antonini Enterprises, LLC is committed to the prevention of discharges of petroleum based products to <br /> navigable waters and the environment, and maintains the highest standards for spill prevention, control <br /> and countermeasures through regular inspections, reviews, implementation and updating of this Spill <br /> Prevention Control and Countermeasures Plan (SPCC)for its facility in Lathrop, California. <br /> Authorized Facility Representati : Greg Lowman <br /> Signature: i — <br /> Title: Safety Sup rvisor, Antonini Enterprises, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.