Laserfiche WebLink
• SPILL PREVENTION CONTROL AND COUNTERMEASURE <br /> COMPLIANCE INSPECTION PLAN <br /> REVIEW PAGE <br /> In accordance with 40 CFR 112.5(b), a review and evaluation of this SPCC Plan is conducted at least <br /> once every five years. As a result of that review and evaluation, Antonini Enterprises,LLC,will amend the <br /> SPCC Plan within six(6)months of the review to include more effective prevention and control technology <br /> if(1)such technology will significantly reduce the likelihood of a spill event from the facility, and (2)If such <br /> technology has been field proven at the time of review. Any amendment to the SPCC Plan shall be <br /> certified by a Professional Engineer` within six (6) months after a change in the facility's design, <br /> construction, operation, or maintenance that materially affects the facility s potential for the discharge of oil <br /> into or upon the navigable waters of the United States or adjoining shorelines. <br /> Review Dates Signature <br /> 1. <br /> 2. <br /> 3. <br /> 4. <br /> SPCC Plan amended and certified by a Registered Professional engineer per 40 CFR 112.3(d). <br /> MANAGEMENT APPROVAL <br /> Antonini Enterprises, LLC is committed to the prevention of discharges of petroleum based products to <br /> navigable waters and the environment, and maintains the highest standards for spill prevention, control <br /> and countermeasures through regular inspections, reviews, implementation and updating of this Spill <br /> Prevention Control and Countermeasures Plan (SPCC)for its facility in Lathrop, California. <br /> Authorized Facility Representati : Greg Lowman <br /> Signature: i — <br /> Title: Safety Sup rvisor, Antonini Enterprises, LLC <br />