My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
4469
>
2800 - Aboveground Petroleum Storage Program
>
PR0540158
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:10:23 PM
Creation date
8/24/2018 6:19:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540158
PE
2832
FACILITY_ID
FA0019881
FACILITY_NAME
FARMINGTON CIRCLE K
STREET_NUMBER
4469
Direction
S
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
FARMINGTON
Zip
95230
APN
18713010
CURRENT_STATUS
01
SITE_LOCATION
4469 S ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\E\ESCALON BELLOTA\4469\PR0540158\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
10/14/2016 10:50:47 PM
QuestysRecordID
3022137
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI SP001 Portable Container Monthly Inspection Checklist <br /> General Inspection Information: <br /> Inspection Date: Retain Until Date: (36 months Gam inspection date) <br /> Prior Inspection Date: Inspector Name: <br /> Containers Inspected(ID R's): <br /> Inspection Guidance: <br /> For equipment not included in this Standard,follow the manufacturer recommended inspection/testing schedules and procedures. <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified Inspector. • <br /> It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> ➢ (•)designates an item in a non-conformance status.This indicates that action is required to address a problem. <br /> Y Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design,a Certified Inspector,or a tank manufacturer <br /> who will determine the corrective action.Note the nonconformance and corresponding corrective action in the comment section. <br /> > Retain the completed checklists for 36 months. <br /> ;tem Area: Area: Area: Area: <br /> 1.0 AST Containment/Storage Area <br /> ASTs within designated Yes 'No Yes !No' Yes No- Yes ;No' <br /> storage area? <br /> 1.2 Debris.spills,or other fire Yes' Yes* :No 'Yes• No 'Yes* No , <br /> hazards in containment or <br /> storage area? ' <br /> waren .r:outdoor Yes" Yes• No .Yes" No - Yes' No <br /> secondary containment? <br /> s Dram calves operable es ' INo• Yes' No :Yes* :No !Yes' No <br /> and it a OOsed <br /> position? <br /> L5 Egress pathways clearY s . 'No• Yes* No Yes* No 'Yes• INo <br /> and gate s,•doore. <br /> operable! <br /> 29 <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.