Laserfiche WebLink
STI SP001 Annual Inspection Checklist <br /> General Inspection Information: n <br /> htspccrion Date: led- 6 Retain Until Date: + p (36 months from inspection date) <br /> Prior Inspection Dale: f/�y)_ `a 01 9 Inspector Name: l S L)� �G7 S I N <br /> 'ranks Inspected(ID M's): <br /> i <br /> Inspection Guidance: <br /> For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures. <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified Inspector. <br /> It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> Y Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area,interstice,or spill container.Before discharge to the environment. <br /> inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> In order to comply with EPA SPCC(Spill Prevention.Control and Countermeasure)rules.a facility must regularly test liquid level sensing devices to ensure proper operation <br /> (40 CPR I I2.8(c)(8)(v)). <br /> L (')designates an item in a non-conformance status.This indicates that action is required to address a problem. <br /> D Non-conforming items imnortant to tank or containment integrity require evaluation by an engineer experienced in AST design,a Certified Inspector.or a tank manufacturer <br /> who will determine the corrective action.Note the non-conformance and corresponding corrective action in the comment section. <br /> S Retain the completed checklists for 36 months. <br /> Y Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> Note: 1 f a change has occurred to th2 tank system or containment that may affect the SPCC plan,the condition should be evstuated against the current plan <br /> requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> r1.0 <br /> Status Comments <br /> nk Containment <br /> !'I.- +n, qp.., t.• Yes* Q9 'N/A <br /> :u•: .. .;at. <br /> No Ho.Qt.9, Ga-ade-s I n coii4eov.�^�} c� <br /> &I fCXA <br /> WJ <br /> trr iN I.iC.Rr;;rt C lam) `� O 1..1 vtQ-y- <br /> 2.0 Tank Foundation and Supports <br /> V No <br /> 'a:ncabi:r ss:u,cuN <br /> gal' Yes N/A <br /> Ll' rInE vi.ill <br /> 23 <br /> I <br /> I <br />