My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:57:11 PM
Creation date
8/24/2018 6:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
12/19/2017 10:45:19 PM
QuestysRecordID
3750331
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Entronmental Health Department • A � � <br /> Ms. Elena Manzo <br /> RE: GEMCO Ripon Truck Plaza, Inc. OCT 19 2015 <br /> 1022 E. Frontage Road, Ripon <br /> REi Project No. 15030 ENVIRONMENTA! <br /> October 15, 2015 HEA'-"'C7pATMcNT <br /> Summary: <br /> Not all areas of the facility and work required to bring the site facility into <br /> compliance has been completed. Remaining tasks to be done and reports <br /> submitted include the following: <br /> • Install white paint over the "closed"word on vertical storage tanks 1 and 2. <br /> • Accurate scaled Topographic Map and Facility Diagram. <br /> • Install sealant on the inside of the CMU block secondary containment wall <br /> around the vertical tanks. <br /> • Obtain Integrity Reports for each of the tanks from qualified inspector. <br /> • Verify liquid level sensing devices are operating properly. <br /> If you are aware of other items needing attention, please bring this to our attention. <br /> Sincerely, <br /> ROBERTSON ENGINEER;inc. <br /> Mike Robertson <br /> MBR/kebr <br /> Enc. <br /> c: Kulwinder Johal, Owner/Operator <br /> Y://LDD://15030://LMml/20151015SaWeaquinCoEnvHmithMa O B E RTSO N <br /> NGInc EKING <br /> RE <br />
The URL can be used to link to this page
Your browser does not support the video tag.