Laserfiche WebLink
SWRCB,January 2002 Page 2 of J. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer _�rI dustry Standard ❑Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: essure C1 Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution' <br /> Piping Run# Piping Run# Piping Run# Piping Run # <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading <br /> Test End Time: , �4 <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or 0 <br /> Criteria: . <br /> Test Result: ,Vass Fail ❑ Pass Ci Pail Pass --. Fail ❑ Pass Fail <br /> Comments"-(include information on repairs made prior to testing, and recommended_1ollow-u for failed tests) <br /> t J <br /> J J ? <br /> r _ t <br /> 1 ' 'dI- <br /> . I 5 " <br /> 1 � <br />