Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for GEMCO RIPON TRUCK PLAZA INC as of Apri124, <br /> 2017. <br /> Open violations from March 18, 2015 inspection <br /> Violation#715 -Failed to regularly test liquid level sensing devices to ensure proper operation. <br /> Procedures and frequency of testing for these devices were not addressed in the Spill Prevention, Control, and <br /> Countermeasure (SPCC) plan. While onsite the existing liquid level sensors connected to the onsite Veeder Root <br /> system were tested along with the liquid sensors connected to the onsite underground storage tank (UST) system. <br /> Liquid level sensing devices must be installed in accordance with CFR 112.8 and shall be regularly tested to ensure <br /> proper operation. Immediately revise the SPCC plan to include appropriate testing procedures for these devises <br /> and conduct all necessary testing (as required), or provide equivalence as allowed by CFR 112.7(a)(2). <br /> Page 6 of 6 <br />