Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for GEMCO RIPON TRUCK PLAZA INC as of August20, <br /> 2018. <br /> Open violations from March 18, 2015 inspection <br /> Violation#621 -Failed to schedule and conduct discharge prevention briefings at least annually. <br /> Discharge prevention briefings are not scheduled at least once a year. Discharge prevention briefings for oil <br /> handling personnel must be scheduled and conducted at least once a year to assure adequate understanding of the <br /> SPCC Plan for that facility. Such briefings must highlight and describe known discharges or failures, malfunctioning <br /> components, and any recently developed precautionary measures. Immediately schedule and conduct a discharge <br /> prevention briefing, ensure that they are scheduled and conducted at least once a year. <br /> Violation#715 -Failed to regularly test liquid level sensing devices to ensure proper operation. <br /> Procedures and frequency of testing for these devices were not addressed in the Spill Prevention, Control, and <br /> Countermeasure(SPCC)plan. While onsite the existing liquid level sensors connected to the onsite Veeder Root <br /> system were tested along with the liquid sensors connected to the onsite underground storage tank (UST)system. <br /> Liquid level sensing devices must be installed in accordance with CFR 112.8 and shall be regularly tested to ensure <br /> proper operation. Immediately revise the SPCC plan to include appropriate testing procedures for these devises and <br /> conduct all necessary testing (as required), or provide equivalence as allowed by CFR 1127(a)(2). <br /> Page 5 of 5 <br />