My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2800 - Aboveground Petroleum Storage Program
>
PR0528391
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 3:22:29 PM
Creation date
8/24/2018 6:36:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528391
PE
2832
FACILITY_ID
FA0007158
FACILITY_NAME
CDCR-DEUEL VOCATIONAL INSTITUTION
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
Rd
City
Tracy
Zip
95304
APN
23912001
CURRENT_STATUS
01
SITE_LOCATION
23500 Kasson Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\K\KASSON\23500\PR0528391\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/24/2017 3:58:18 PM
QuestysRecordID
3695872
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Inspection lnfcrmation• <br />Inspection Date: ` <br />Prior InaraNin., rl..�..- <br />Tanks Inspected (rD ##'ay <br />Inspection Guidance: <br />STI SP001 Annual Inspection Checklist <br />Retain Until Date: <br />Inspector Nana: <br />(36 months from Inspection date) <br />r For equipment not included in this standard, follow the manufacturer recommended inspectionitesting schedules and procedures. <br />The periodic AST Inspection is intended for monitoring' he external AST condition and its containment structure. This visual inspection does not require a certified <br />inspector. it shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br />Inspect the AST shell and associated piping, valves, and pumps including inspection of the coating for Paint Failure. <br />Y Inspect: <br />1. Earthen containment structures including examination for holes, washout, and cracking in addition to liner degradation and tank settling. <br />2. Concrete containment structures and tank foundations/supports including examination for holes, washout, settling, paint failure, in addition to examination for <br />corrosion and leakage. <br />3_ Steel containment structures and tank foundations/supports including examination for washout, settling, cracking, and for paint failure, in addition to <br />examination for corrosion � and leakage. <br />Inspection of cathodic protection system, if applicable, includes the wire connections for galvanic systems and visual inspection of the operational components <br />(power switch, meter, and alarms) of impressed current systems. <br />Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spilt container. Before discharge to the <br />environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br />In order to Comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid level sensing devices to ensure proper <br />operation (40 CFR 112.8(c)(8)(v)). <br />y (') designates an item in a non-conformance status. This Indicates that action is required to address a problem. <br />r Nan -conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a certified inspector, or a tank <br />manufacturer who will determine the correcfive action. Note the nen-conformance and corresponding corrective action in the comment section. <br />i= Retain the completed checklists for 36 months. <br />Complete this checklist on an annual basis supplemental to the owner monthly -performed inspection checklists. <br />Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current <br />plan requirement by a Professtonal Engineer knowledgeable in SPCC development and implementation, <br />AST INSPECTION STANDARD 31 <br />JULY 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.