Laserfiche WebLink
General Inspection lnfcrmation• <br />Inspection Date: ` <br />Prior InaraNin., rl..�..- <br />Tanks Inspected (rD ##'ay <br />Inspection Guidance: <br />STI SP001 Annual Inspection Checklist <br />Retain Until Date: <br />Inspector Nana: <br />(36 months from Inspection date) <br />r For equipment not included in this standard, follow the manufacturer recommended inspectionitesting schedules and procedures. <br />The periodic AST Inspection is intended for monitoring' he external AST condition and its containment structure. This visual inspection does not require a certified <br />inspector. it shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br />Inspect the AST shell and associated piping, valves, and pumps including inspection of the coating for Paint Failure. <br />Y Inspect: <br />1. Earthen containment structures including examination for holes, washout, and cracking in addition to liner degradation and tank settling. <br />2. Concrete containment structures and tank foundations/supports including examination for holes, washout, settling, paint failure, in addition to examination for <br />corrosion and leakage. <br />3_ Steel containment structures and tank foundations/supports including examination for washout, settling, cracking, and for paint failure, in addition to <br />examination for corrosion � and leakage. <br />Inspection of cathodic protection system, if applicable, includes the wire connections for galvanic systems and visual inspection of the operational components <br />(power switch, meter, and alarms) of impressed current systems. <br />Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spilt container. Before discharge to the <br />environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br />In order to Comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid level sensing devices to ensure proper <br />operation (40 CFR 112.8(c)(8)(v)). <br />y (') designates an item in a non-conformance status. This Indicates that action is required to address a problem. <br />r Nan -conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a certified inspector, or a tank <br />manufacturer who will determine the correcfive action. Note the nen-conformance and corresponding corrective action in the comment section. <br />i= Retain the completed checklists for 36 months. <br />Complete this checklist on an annual basis supplemental to the owner monthly -performed inspection checklists. <br />Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current <br />plan requirement by a Professtonal Engineer knowledgeable in SPCC development and implementation, <br />AST INSPECTION STANDARD 31 <br />JULY 2006 <br />