Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department _ t <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209)468-3433 Web:www.sjgov.org/ehd 1__ <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> CDCR-DEUEL VOCATIONAL INSTITUTION 23500 KASSON RD, TRACY I May 24, 2016 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction AV jR COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves, piping,and appurtenances V 12 R L COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on ■V ❑R E_COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ■V R COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation V R COS <br /> 4020 See below Unlisted Training violation V R COS <br /> 4030 See below Unlisted Operations/Maintenance violation V R COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation V R COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS ll,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 102 HSC 25270.4.5(a) Failed to properly close a tank that is considered permanently closed. <br /> Two tanks (observed next to the farm office)were labeled as"Out of Service Empty".When a tank is not in use, it <br /> must be permanently closed by meeting the following conditions: <br /> - remove all liquid and sludge from each container and connecting line <br /> -disconnect and blank off all connecting lines and piping have from the tank <br /> -close and lock all valves <br /> - post a sign conspicuously stating that it is a "permanently closed container and denoting the date of closure. <br /> Immediately "Permanently Close" all tanks that are not being used or amend the Spill Prevention, Control, and <br /> Countermeasure Plan to include all petroleum tanks that have not been permanently closed. Submit proof of <br /> correction to the EHD. <br /> This is a Class II violation. <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE) missing or incomplete. <br /> The Professional Engineer (PE) certification is incomplete. The reviewed SPCC plan appears to be conditional on <br /> the required corrections to the facility's regulated storage tanks. These deficiencies were documented in Table A-1 of <br /> the reviewed SPCC plan. As such, the existing SPCC plan is conditional on repairs which were not implemented and <br /> therefore not adequate for this facility. The PE certification must include all of the aspects in 40 CFR 112.3(d)(1), <br /> including attesting that the PE is familiar with 40 CFR Part 112, he or his agent has visited and examined the facility, <br /> the Spill Prevention, Control, and Countermeasure (SPCC) Plan has been prepared in accordance with good <br /> engineering practice, including consideration of applicable industry standards, procedures have been established for <br /> required inspections and testing, and the Plan is adequate for the facility. Immediately obtain a complete PE certified <br /> plan for this facility. Submit a copy of the completed certification to the EHD. <br /> This is a Class II violation. <br /> Page 3 of 7 <br />