Laserfiche WebLink
AUG-07-2000 MON 08;43 AM FXLARCADIA FAX NO. 626 jj9496 P. 02 <br /> • i <br /> SPILL PREVENTION CONTROL AND COUNTERMEASURE <br /> COMPLIANCE INSPECTION PLAN <br /> REVIEW PAGE <br /> In accordance with40CFR 112.5(b),areview and evalhtationofthisSPCCPIanisconduetedallcaseonceeverythree <br /> years. Asn result of this review and ovolualion,Food rxpress,Inc. will amend the SPCC Plan within six months of <br /> therevicwtoinchtdemorecrfcolivepreventionandconlroltechnologyif(1)suchtechnologywillsignificantlyreduce <br /> Ilse likelihood of a spill event from the facility,and(2)if such technology has been field-proven at the lime of review, <br /> Any amendment to the SPCC Plan shall be certified by a Professional Engineer within six months after a change in <br /> the facility design,construction,operation, or maintenance occurs which materially affects the facility's potential for t;` <br /> the discharge of oil into or upon the navigable waters of the United Slates or adjoining shorelines. <br /> Review Dales Signature <br /> 2. r. <br /> 3. <br /> 4. <br /> W + <br /> 5. <br /> 6. _ <br /> �t <br /> w <br /> "SPCC Plen amended and certified by a Registered Professional Engineer per 40 CFR 112.3(d). <br /> MANAGEMENT APPROVAL <br /> Food Express, Inc. is committed to the prevention of discharges of oil to navigable waters and the eavirouniont,and <br /> maintains the highest standards for spill prevention control and countermeasures through regular review, undaWtg, <br /> and implementation of this Spill Prevention Control and Countermeasure Plan for the Lathrop Terminal <br /> Aulliorized Facility Represuntative: Steve Garcia Signature,zv <br /> Title: Ternundl Mama ncr <br />