My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
37350
>
2800 - Aboveground Petroleum Storage Program
>
PR0539897
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 1:10:18 PM
Creation date
8/24/2018 7:40:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0539897
PE
2832
FACILITY_ID
FA0011282
FACILITY_NAME
Valley Rock Quarry
STREET_NUMBER
37350
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95378
CURRENT_STATUS
01
SITE_LOCATION
37350 S BIRD RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\37350\PR0539897\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
4/9/2018 9:12:51 PM
QuestysRecordID
3849882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br /> <br />From: Aranda, Cesar <arandac@vmcmail.com> <br />Sent: Friday, August 10, 2018 3:19 PM <br />To: Cesar Ruvalcaba [EH] <cruvalcaba@sjcehd.com> <br />Subject: Re: APSA/SPCC inspection <br /> <br />Good Afternoon Cesar, <br />Vulcan Materials is in the process of evaluating permanent closure of the above ground diesel and used oil <br />storage tanks, and, removal of the portable asphalt oil storage tank. <br /> <br />Vulcan respectfully requests a 30 day extension to complete the evaluation and permanent closure/removal of <br />the tanks. Should the evaluation determine permanent closure/removal not being feasible, the SPCC will be <br />revised in accordance with the inspection report dated July 12, 2018. <br /> <br />Feel free to contact me should you have any questions. <br />Thanks, <br />Cesar <br /> <br />-- <br />Cesar Aranda, P.E. <br />Manager, Water Resources <br />Vulcan Materials Company / West Region <br />11599 Old Friant Road, Fresno, CA 93730 <br />Direct: (559) 434-1202 <br />Cell: (559) 978-1721 <br />
The URL can be used to link to this page
Your browser does not support the video tag.