Laserfiche WebLink
.-..__._...._ . <br />_. _.. ___ __ ____._......._..-..._. _ 2018 <br />CALIFORNIA HIGHWAY PATROL, STOCKTON <br />._.__._..-_------------.--_...._.. -. . <br />AREA OFFICE <br />SPILL PREVENTION CONTROL & COUNTERMEASURE PLAN <br />Figure 1 - SPCC Plan Update/Review <br />art 112.5(a), the SPCC Plan must be amended anytime ,...when there is a <br />As required by 40 CFR P operation, or maintenance that materially affects its <br />change in the facility design, construction, <br />potential for a discharge ...• <br />C Plan <br />least <br />As required by <br />40 CFR Part 112.5(b), "... a review and evaluation of the SPS equiredtby the once <br />every five years from the date such facility becomstockton officesubject to . -certified <br />major changes Cetisteaedity <br />operators of the California Highway Patrol (CHP) <br />have occurred since the last review, the plan must be updated and re -certified by 9 <br />Professional Engineer. <br />If more effective prevention and control technology has been field -proven at the time of the review <br />I reduce the likelihood of a discharge fromthefacility, the SPCC Plan must e <br />and will significantly <br />amended within 6 months of the review to include this technology. <br />If no amendment is necessary, the reviewers will indicate on the SPCC Plan that a review was <br />conducted on a certain date, along with their signature and title - "No amendment is necessary as <br />per 40 CFR Part 112.5(b)." early as <br />w an <br />update this SPCC <br />It is recommendedthe <br />that the Stockton CHP Office revcontactl <br />and management information is <br />part of the annual SPCC training to ensure that <br />kept up to date. <br />Title <br />Name Auto Technician <br />Jim Murray <br />_moo - / <br />Reviewed on: <br />The next review date will be: <br />Signature <br />- 5 - <br />