Laserfiche WebLink
Sinclair Properties (P11-033} <br /> 1 P 018 <br /> Marc Sinclair <br /> i <br /> March 24, 2011 <br /> HEA[TH f. <br /> The approved use is required to comply with applicable provisions of the Stockton"M6"nicipal <br /> Code (SMC) including, but not limited to, the following: <br /> I Structures and other improvements, including fencing, paint, landscaping and irrigation <br /> systems, shall be maintained in a manner so as not to be blighted or deteriorated <br /> (SMC Section 8.36.040). <br /> 2_ Any graffiti on the property must be removed within 48 hours (SMC Section 8.24.050). <br /> 3. Outside storage and/or processing will not be permitted without prior approval of the <br /> Community Development Director and must be in compliance with all applicable <br /> provisions of SMC Division 16.36.100, "Screening and Buffering," <br /> 4. Electrical, plumbing and/or mechanical building permits will be required for the <br /> installation of equipment, as well as for storage racking and conveyors. All equipment <br /> must either be listed and labeled for compliance with applicable code requirements or <br /> be third-party inspected and approved. <br /> NOTES: <br /> Copies of the memos that were received from the Fire Department, the San Joaquin Valley Air <br /> Pollution Control District and the San Joaquin County Environmental Health Department(dated <br /> March 2, March 2 and March 8, 2011, respectively) regarding the project have been attached to <br /> the Use Permit. <br /> The applicant is required to comply with all applicable state and local requirements related to <br /> the generation, storage and handling of hazardous materials. <br /> cc: ECS Refining Texas, LLC Hakeem, Ellis & Marengo <br /> Attn: Bill McGeever Attn: Michael D. Hakeem <br /> 705 Reed Street 3414 Brookside Road, Suite 100 <br /> Santa Clara, CA 95050 Stockton, CA 95219 <br /> APPROVED: 0�y DATE ISSUED: March 24,2011 <br /> v <br /> cc: ENGINEERING BUILDING FIRE POLICE BUSINESS LICENSE FILE COPY <br /> GSWRL:hv <br /> NOTICE: To protest the imposition of any development fee,dedication,reservation or other exaction imposed on your project,you must file <br /> written notice with the City Clerk's office within 90 days after approval of the project or imposition of the fees,dedications,reservations or other <br /> exactions stating that the required payment is tendered or will be tendered when due,or that any conditions which have been imposed are <br /> provided for or satisfied,under protest,along with a statement of the factual elements of the dispute and the legal theory forming the basis for <br /> the protest. <br /> ::ODMAIGRPWISEkCOS.CDD.CDD Library:90150.1 <br /> PAGE 2 OF 2 <br />