My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 9:26:53 AM
Creation date
9/4/2018 1:38:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W� ten►. kx. <br />lob: 342525 ,.::Buena Park CA 1h Ave <br />ZI <br />(j limnse a _3CM5 <br />c <br />Job: 342825 <br />Status: TechReview <br />Customer: CHEVRON PRODUCTS, US - Tech: GLENN KELLEY JR Severity- 4 Hour <br />J. ROLOFF <br />Chevron 307709 Ref #: 180128-052 Respond By: 1/28/2017 2:30 PM <br />10858 TRINITY PARK WAY Work Order #: Called Time: 1/29/2018 8:37 AM <br />STOCKTON, CA 95219 originator: 2nd Site 1st Arrival: 1/28/2018 11.:00 AM <br />Completed: 1/30/2018 9:15 AM <br />Notes <br />I— Jan 30 2018 8:50AM - RSimms —1 <br />Ran PLLD line test, verified site operational and reopened site. Will return for cold start monitor cert with agency. <br />I <br />I-- Jean 30 2018 2:04AM - RSirnms --1, <br />.While onsite created D8 comm alarm, Q1, Q2, Q3 shutdown, LI, 3, 4, 21, 6, 13, 7, 15, 23, 9, 17, 25, 11, 19, 27 Sensor Out <br />alarms. <br />j1- Jan 30 2018 1:57AM - RSimms --i <br />;Attempted tore map ISD - veeder root went into warm start loop. Replaced ECPU2 Board and NV Mem. Cold started and <br />!attempted to retrieve archive - had to hand reprogram site, archive not retrieved. Vapor pressure sensor not showing up <br />ion programming, replaced and verified proper operations - OK. Will monitor and verify readings for all flowmeters. <br />I— Jan 29 2018 8:39AM-13Sims --I <br />iH-8 gross, ISD sensor out, f-4 check flow meter I checked Veederoot on IV8700 & all flow meters showed zeros changed <br />out f-4 flow meter again & Cleared 1-1-•8 gross & LSD sensor out & checked IV8700 again still all zeros shoot V/L at nozzle <br />1.06 checked an Veederoot it showed all zeros again put lob on delay for more testing on Monday <br />Tasks <br />T k Number <br />1 Monitoring Sensor - ISD Wam-Gross PSI Replaced (Same) <br />Pressure <br />Parts <br />+Entry Date Item Number Qescription SN Quantity <br />11/30/2018 04434N Kit, Vaper Pressure Sensor 1.00 <br />1/30/2018 04391N Kit, Vapor Flow Muer 1.00 <br />1/30/2018 05703N Software Upgrade w/ECPU2 Board, Ver. 27 1.00 <br />�. tomer signatu Print Name �- � Oate <br />11,30120 18 8.50:18 R Al l <br />
The URL can be used to link to this page
Your browser does not support the video tag.