My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 9:26:53 AM
Creation date
9/4/2018 1:38:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OMPANY: Tooley Oil DATE OF QUOTATION QUOTE NUMBER <br />ROJECT: 2420 W Turner 09115117 tc91517-01 <br />QTY Part Number DESCRIPTION UNIT PRICE EXTENDED <br />Above Specifications Exclude the Following (Unless Otherwise Noted): Plans, Permits, Inspection, All Testing, Labor to Assemble or Install, <br />Miscellaneous Pipe Fittings and Accessories, Any Electrical Consideration, Offloading or Setting Any Equipment or Tank, Site Improvements, Guard <br />Barriers, Any Other Items (s) Not Specifically Mentioned Above <br />Equipment Only: No Installation. Subject to engineer's approval. This quotation does not Include or imply any equipment or quantities otherthan listed <br />herein. Contractor to determine actual quantities required. No retainage to apply. <br />ormance: Performance of equipment listed Is based upon the accuracy of the information supplied to NW Pump <br />Equipment Co, by the customer or customer's engineer. Guarantee of performance may require approval by a <br />sed engineer at the customer's expense. NWP is not responsible for any warranty outside of standard manufacturer <br />Tank Submittal Drawings: Tanks require approved, signed drawings before production of the tank may begin. Any quoted lead time is based on <br />produdion time required once approved submittal drawings have been received by Northwest Pump & Equipment. <br />Verifone Terms: Special terms apply to the Verifone Equipment. Prices reflect a 3% cash discount. Payments must be received within 10 days of <br />invoice. 3% vrill be added to invoice and maybe deducted if paid vdthin 10 days. Credit card payment not applicable with these terms. Initials <br />Gilbarco 1 Gasboy Terms: Special terms apply to the Gilbarco/Gasboy Equipment. Prices reflect a 3% cash discount. Payments must be <br />received within 10 days of Invoice. Invoices are sent upon completion of the order at the factory. 3% will be added to Invoice and maybe <br />deducted if paid within 10 days. Credit card payment not applicable with these terms. Initials <br />'60 month lease option for this project shown above. Actual monthly payment Is catculated by Patriot Capital Corporation and is subject to their <br />ualifications to acquire this lease payment structure. Lease Is structured with a One Dollar Purchase Option, ownership of the equipment takes place at <br />Ie and of the lease term. For more Information, contact Geoff Smith at 415-550-8951 <br />Page 3 of 3 <br />Northwest Pump Equipment Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.