My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 9:26:53 AM
Creation date
9/4/2018 1:38:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ ' k . X37 n COMmdtw�ptlh Ave <br />Job: <br />34"2825 !//' - - Buena Pwt CA 906ZI <br />(� V LkCnsc8300345 <br />G <br />.lob: 342825 <br />Status: TechReview <br />Customer: CHEVRON PRODUCT'S, US - <br />I ROLOFF <br />Chevron 307709 <br />10858 TRINITY PARK WAY <br />STOCKTON, CA 95219 <br />Customer Notes <br />Tech: GLENN KELLEY ]R <br />Ref #: 180128-052 <br />Work Order #: <br />originator: 2nd Site <br />Severity: 4 Hour <br />Respond By. 1/28/2017 2:30 PM <br />Called Time: 1/29/2018 8:37 AM <br />1st Arrival: 1/28/2018 11:00 AM <br />Completed: 1/30/2018 9:15 AM <br />I— ]an 30 2018 8:50AM - RSimms —1 <br />Ran PLLD line test, verified site operational and reopened site. Will return for cold start monitor cert with agency. <br />I-- ]an 30 2018 2.04AM - RSimms --1 <br />'While onsite created D8 comm alanyl, Q1, Q2, Q3 shutdown, LI, 3, 4, 21, 6, 13, 7, 15, 23, 9, 17, 25, 11, 19, 27 Sensor Out <br />alarms. <br />I- Jan 30 2018 1:57AM - RSimms --I <br />Attempted to re map ISD - veeder root went into warm start loop. Replaced ECPU2 Board and NV Mem. Cold started and <br />attempted to retrieve archive - had to hand reprogram site, archive not retrieved. Vapor pressure sensor not showing up <br />on programming, replaced and verified proper operations - OK. Will monitor and verify readings for all flowmeters. <br />I— Jan 29 2018 8:39AM - DSims --I <br />H-8 gross, ISD sensor out, f-4 check flow meter I checked Veederoot on IV8700 & all flow meters showed zeros changed <br />out f-4 flow meter again & Cleared H--8 gross & ISD sensor out & checked TV8700 again still all zeros shoot V/L at nozzle <br />1.066 checked on Veederoot it showed all zeros again put yob on delay for more testing on Monday <br />Tasks <br />Ta sik- Tumber <br />1 Monitoring Sensor - ISD Warn -Gross PSI Replaced (Same) <br />Pressure <br />Parts <br />( Entry Date Item,Number Description Quantity <br />11/30/2018 04434N Ktt, Vaper Pressure Sensor 1.00 <br />1/30/2018 04391N Kit, Vapor Flaw Meter 1.00 <br />1/30/2018 05703N Software Upgrade w/ECPU2 Board, Ver. 27 1.00 <br />a P-/ <br />4ZI: <br />T� <br />'Mi—tomer S'ignatur Print Name l7ata <br />113012018 8:50:18 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.