Laserfiche WebLink
Op4UIN• C <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />im 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />• c P Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />4�/�pRN <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />Leak detector <br />❑ <br />Facility Address: <br />Service Request #: <br />tovs-g <br />SR 00bo.),- <br />Onsite Service Technician's Nam : <br />ICC Ser a Te hnician/Installer Exp. Date: <br />Manufacturer Training: <br />14& 'an <br />❑ mechanical Model: <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />. <br />❑ line test programmed <br />Inctor- <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />Drop tube with mechanical overfill at 95010 <br />Drop tube with mechanical overfill at 95% <br />Overfill prevention (see LIS letter 150-1) 6j 9Oe Y <br />yo,tThis KST facility is APPROVED to operate <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />L <br />Primary piping testing at: �, vie,'�Q g <br />. <br />psi a/ S -7 d5L <br />Inctor- <br />1 <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation. 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />3,(8 <br />❑ This UST facility is NOT APPROVED to operate <br />110 r+5 w,d <br />EHD 23-04UST SERVICE REQUEST INSPECTION REPORT <br />Rev 4/30/12 1 O1 <br />fill Mim WPM I _. <br />Ar W <br />. <br />. - .'r -�EHD <br />Inctor- <br />EHD 23-04UST SERVICE REQUEST INSPECTION REPORT <br />Rev 4/30/12 1 O1 <br />