My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 9:26:53 AM
Creation date
9/4/2018 1:38:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.O.# NW1-2330296 Cust Ref# : CUCO PO# 0015230347 <br /> _ Tanknology Inc. -- - <br /> 11000 N.1v1ol'ac Expressway,Suite 500 Austin,TX 78759 (800)964-0010 Policy 100-29-A <br /> JOB CLEARANCE FORM& Rev:D <br /> Revised:1/24i2014 <br /> SITE SAFETY CHECKLIST-OVF <br /> Site t- me!#: Street Address: W.O.# <br /> � gvn�J "t- 30Z70q IM c �530).g& <br /> Arrival Time: Departure Time: Travel Time: Oltlars on site Date <br /> d !8" 3d <br /> Scope of Work and Tasks Performed(JSA's must be available for all tasks): <br /> L A 5,5, S- W, o. 0 -DSD <br /> Re to Equ ent or rts Provided," f f/AG 2 d SIP /L6 !�J <br /> On/�� /i(!� C.('O T// 06 L WSt� Y SO �O�.tz�.t', f� /SA'"�j ON'rL3 5616 <br /> c,oc6o �itw t n/ p vo S!ltrt E r w .J <br /> Foll w-up actions required:equipment isolated;comments: <br /> Cb..�Pi stern <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED Check Items used or mark—if not applicable) <br /> Safety Vest Safety Glasses Gloves Hearing Protection <br /> Steel Toe Boots Splash Goggles Hard Hat Other <br /> ✓ PRE-TEST PROCEDURES Check each item completed or mark ^ if notapplicable) <br /> 1. Discuss safety procedures With site personnel. Nearest hospital: d! L L <br /> 2. Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. A Secure entire work area with barricades(cones,flags,and caution tape,pennant flags,or other perimeter guard). <br /> 4. Ae Place fire extinguishers and'No Smoking"signs in the work area. <br /> 5. 0( Implement Lockoutlfagout per API 1646(when accessing product piping during tasks) <br /> K All applicable equipment disabled during test(s) Secure the circuit breaker(s)with lockout devices and tags. <br /> Secure nozzles with"Out of Service"bags and nylon ties. I Verify LOTO is complete by trying to operate pumps. <br /> Close ball valves or check valves or product piping. _ Disconnect electrical'bayonet'connector from the STP(s)- <br /> SIGN IN Lead Technician Name Lead Technicisn ignatum <br /> General Safety Checks: <br /> All site personnel have been informedy��J�t6»t5 <br /> Fuel delivery has been Infdmled. SEe Representative Name de Represents a Signature -- <br /> Is a fuel delivery due today? /�` 12' L_(✓ N <br /> LOTO procedures have been disco ed and agreed. l._. <br /> Work areas barricaded to protect workers,staff&public. I have discussed'ob clearance form with technician. <br /> ✓ POST-TEST PROCEDURES!Check each item completed or mark - if not applicable) <br /> 1. Remove all"LockouttTagout"devices. ,/ <br /> 2. Run all pumps and verify there are no leaks: tl, Impact Valve Test Ports under dispensers <br /> -. Leak Detector Threads on STP's -1 Functional Elements&Relief Screws <br /> 3. Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: L1_ L2_ L3_ L4- L5_ L6_ <br /> 4 i;< Check following components operational: f�ATG probes,sensors,&caps <br /> Ball floats,dry breaks&caps Cathodic protection operational <br /> Containment sumps are dry Dispensers&POS operational <br /> ,41 Dispenser panels are replaced Drop tubes,fill adapters&caps <br /> Leak detectors&vent tubes Manhole covers and sump lids <br /> Monitoring system is operational Shear valves are open <br /> Siphon lines and manifold valves Siphon lines and manifold valves <br /> ^� STP fittings and bayonet connectors Vents(not capped,plugged or isolated) <br /> 5. (JC Remove barricades. <br /> SIGN OUT&Operator Verification of Work(OVF) in Name Lead Technician Signature <br /> General Safety Checks: <br /> Work area has been left tidy&safe. u' �/6 �t✓d Sr✓LS 11U4/i�•a' <br /> Site staff are aware of work status including any remaining isolation. -- Site Representative Name rte Re sentative Svnature <br /> Changes to equipment are documented and communicated. <br /> All incidents,near incidents,and unsafe situations reported. <br /> site Representative Comments: <br /> COMPANY CONFIDENTIAL C Tanknology Inc.,2011.All Rights Reserved. <br /> Printed copies of this document are uncontrolled.The current version is available in the 1 anknolo On-Line Document Control System <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.