My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
BILLING_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 2:55:52 PM
Creation date
9/4/2018 4:23:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING_2009 - 2015
FileName_PostFix
2009 - 2015
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IFIED PROGRAM CONSOLIDATED F <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />490-1. <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2. <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />1. <br />BUSINESS NAME (Same as Facility Name or DBA) Chevron Station# 307709 <br />3, <br />BUSINESS SITE ADDRESS 10858 Trinity Parkway 103. <br />CITY <br />104. <br />Stockton, CA 95219 <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the a ui ment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. [23 CCR §2632, 2634, 2638, 2641] <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY ❑ 99.OTHERS eci <br />(p �)' <br />490-3& <br />490-3b. <br />III. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR §2632,26341 4904. <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)heck <br />-Il <br />that apply) <br />I. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5. <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. [23 CCR §2632,2634] <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ® b. LIQUID FILLED ❑ c. PRESSURIZED❑ d. UNDER VACUUM <br />490-6. <br />PANEL MANUFACTURER: Veeder-Root 490-1.MODEL #: TLS-350 <br />490-8 <br />LEAK SENSOR MANUFACTURER: Veeder- Root 490-MODEL #(S): 303 <br />490-10. <br />9. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl. [23 CCR §2643] _ <br />490-11. <br />PANEL MANUFACTURER 490-12. MODEL #: <br />490-13. <br />IN-TANK PROBE MANUFACTURER: 490-14. MODEL #(S): <br />490-15. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />490-18. <br />490-19. <br />- <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION [23 cCR §2646.1] <br />490-20. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) 123 CCR §26451 TESTING PERIOD: ❑ a. 36 HOURS El b. 60 HOURS <br />..-- -... <br />490-21. <br />490-22. <br />._ <br />❑ 5. TANK INTEGRITY TESTING PER [23 CCR §2643.1] <br />490-23. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />490-24. <br />__........_... <br />490-25. <br />�_..........__.. <br />❑ 99. OTHER (Specify): - <br />490-26. <br />490-27. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) Steck all <br />® 1. CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 190.21, <br />123 61 <br />§26336] SECONDARY CONTAINMENT IS: ❑ a. DRY ® b. LIQUID FILLED Elc. PRESSURIZED ® d. UNDER VACUUM <br />190-22 <br />PANEL MANUFACTURER: Veeder-Root 490-30. MODEL #: TLS-350 <br />190-31. <br />LEAK SENSOR MANUFACTURER: Veeder-Root 490-32. MODEL #(S): 208/304 <br />190-33. <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO 190-34. <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 190-35. <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 190-36. <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. 123 CCR§26361 <br />MLLD MANUFACTURER(S): 490-37. MODEL #(S): <br />190-38. <br />® 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. [23 cCR§2636] <br />190-39. <br />ELLD MANUFACTURER(S): Veeder Root 49040. MODEL #(S): PLLD <br />19041. <br />PROGRAMMED IN LINE LEAK TEST: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1g•P• h. <br />19042. <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO <br />19043. <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMPSHUTDOWN. ® a. YES ❑ b. NO <br />1904_ 4. <br />_ ._...... _... _........ <br />❑ 4. PIPE INTEGRITY TESTING. <br />19045. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS[] c. OTHER (Specify) <br />490-46. <br />490.47. <br />❑ 5. VISUAL PIPE MONITORING. <br />49048. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TINE SYSTEM OPERATED' <br />49049. <br />Allowed for monitoringof unburied emergency enerator fuel i in onlyper HSC 25281.5 <br />3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA- (23 CCR §2636(aX3p <br />490-50. <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. <br />490-51. <br />® 99. OTHER (Specify) Product & Vapor Lines Monitored with Veeder Root Vacuum Smart Sensors <br />- 49° 52• <br />490-53. <br />
The URL can be used to link to this page
Your browser does not support the video tag.