Laserfiche WebLink
FIED PROGRAM CONSOLIDATED F <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />490-1. <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2. <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />1. <br />BUSINESS NAME (Same as Facility Name or DBA) Chevron Station# 307709 <br />3. <br />BUSINESS SITE ADDRESS 10858 Trinity Parkway 103 <br />1 CITY <br />104. <br />Stockton, CA 95219 <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. [23 CCR §2632, 2634, 2638, 26411 <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY El99. OTHER (Specify): <br />490-3a. <br />490-36. <br />III. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR §2632,26341 4901. <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />a k 1 1 <br />that <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5. <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. [23 CCR §2632,2634] <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ® b. LIQUID FILLED ❑ c. PRESSURIZED❑ d. UNDER VACUUM <br />49x6. <br />PANEL MANUFACTURER: Veeder-Root 490"7 MODEL #: TLS -350 <br />490-8. <br />LEAK SENSOR MANUFACTURER: Veeder- Root 990- MODEL #(S): 303 <br />490-10. <br />._............__...___...._....__...._.___...._......................................................................_.................................._........................__..._._.._.__....................__........_._.__.._..__...._...._....---------.._-_.__.__._.................._..._..------.._..__._........................ _........................................................ _........................a90=i <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). [23 CCR §26431 <br />i_.._ <br />PANEL MANUFACTURER 490-12. MODEL #: <br />490-13. <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): <br />490-15. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHERS eci <br />g•P• g•P• (Specify): <br />490 -Is. <br />490-19. <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION [23 CCR §2646.1] <br />490-20. <br />__._ ........................................_ _ .................._.... _..........................._-__._............._-- ........._...................................................._...... <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) [23 CCR §2645] TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />--............... .... ----._..............................._-._........ ._.._.. -- .. __.................................-_................... -- - ._....._...---.._......._.....................................................-................._................._._......-.......... <br />490-22.2.l. <br />❑ 5. TANK INTEGRITY TESTING PER [23 CCR §2643.1] <br />490-23. <br />TEST FRE <br />FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHERS eci <br />Q (P fY)� <br />ago 2.a. <br />a90 -2.s. <br />(Specify):_..-- <br />❑ 99. OTHER499 <br />-- <br />0.26. <br />490-27, <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />hatak 111 <br />® 1. CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 191-28. <br />§2636) SECONDARY CONTAINMENT IS: Ela. DRY ® b. LIQUID FILLED Elc. PRESSURIZED ® d. UNDER VACUUM 190.29. <br />PANEL MANUFACTURER: Veeder-Root 490-30. MODEL #: TLS -350 <br />190-31. <br />LEAK SENSOR MANUFACTURER: Veeder-Root 490-32. MODEL #(S): 208/304 <br />190-33. <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO 190-34. <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 190-35. <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF 190-36` <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. [23 CCR§2636] <br />MLLD MANUFACTURER(S): 490-32. MODEL #(S): <br />190-38. <br />-... _.... _--. _................... - ........... _... ----- ... _.................... - - - _.._............. <br />® 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. [23 CCR§2636] <br />-- -- <br />190-39. <br />ELLD MANUFACTURER(S): Veeder Root 49040 MODEL #(S): PLLD <br />19041. <br />PROGRAMMED IN LINE LEAK TEST: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />19042. <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. N a. YES ❑ b. NO <br />190-43. <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. N a. YES ❑ b. NO <br />'9044- <br />90-44.-.-...._........._.. <br />. . .... . ......... . ..- <br />❑ 4. PIPE INTEGRITY TESTING. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS[] c. OTHER (Specify) <br />...........___......__.........._......._......_....._._....................................................................................................................-.._.._........................._. <br />490-46" <br />490-47. __ <br />❑ 5. VISUAL PIPE MONITORING. <br />490-48. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* <br />49049. <br />'_Allowed for monitorin�of unburied emergencZ�enemtor fuel piping only per HS <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. [23 CCR §2636(a)(3)] <br />490-50. <br />_.�......................._...._..._.__...._--.._............._..__.-._.._......................- -.........._..................................... ...... ... .... ............................... _....... _...... -....... _.._._.._...._._..... _._........................ _...... ...... - --._._..._........................................._.--- <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. <br />490-51. <br />.........._.-.-.....................................-....._...............................................-_........ -- - ....-- --..................................................... ...........I....................... _ _._......_ _ __-....-.. _ .... ......_.-_._................. <br />® 99. OTHER (Specify) Product & Vapor Lines Monitored with Veeder Root Vacuum Smart Sensors <br />_.......................... -- <br />490-52. <br />490-53. <br />