Laserfiche WebLink
Monitoring System Certification - Page 2 of 3 <br />Site Address:— 108 58 T ri n i ty P kwy Date of Testing/Servicing: 512 4/ 13 <br />D. Results of Testing / Servicing <br />Software Version Installed. 329.01 <br />Complete the following checklist: <br />❑ Yes <br />® No* <br />Is the audible alarm operational? <br />❑ Yes <br />® No* <br />Is the visual alarm operational? <br />❑ Yes <br />® No* <br />Were all sensors visually inspected, ftinctionally tested, and confirmed operational? <br />❑ Yes <br />® No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />® N/A <br />operational? <br />❑ Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />® N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ❑ Yes ❑ No <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />® N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly9 If so, at what percent of tank capacity does the alarm trigger? 0 % <br />® Yes* <br />❑ No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />a No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />® Yes 1 <br />❑ No* 1 <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set-up reports, i a licable. <br />® Yes 1 <br />❑ No* I <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: 5/1113 - On site with Inspector to test S2 and S4 Vac sensor's, along with Diesel LLD. Vac <br />Sensor's passed, Diesel LLD failed. Will need to return with new Turbine Motor after Parts <br />arrival. <br />5124/13 - On Site to Test Diesel PLLD Only. <br />Replaced Diesel PLLD, Syphon Jet & Check Valve - Re -tested & Passed. <br />