Laserfiche WebLink
' <br />. 9. SII Bucket Testing Repor 71 orm SWRCB, January 2006 <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: CHEVRON 3 0 7 7 0 9 <br />Date of Testing: 09/14/2009 <br />Facility Address: 10858 TRINITY PKWY STOCKTON, CA, 95210 <br />Facility Contact: MANAGER <br />Phone: (2 0 9) 952-2213 <br />Date Local Agency Was Notified of Testing <br />Name of Local Agency Inspector (if present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANKNOLOGY, INC. <br />Technician Conducting Test: STEVEN WILLEMS <br />Credentials 1: <br />❑ <br />CSLB Contractor ❑ <br />ICC Service Tech. <br />❑ <br />SWRCB Tank Tester ❑ Other (Specify) <br />License Number: <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: Ffl Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: tape measure <br />Equipment Resolution: no leak loss <br />Identify Spill Bucket(By Tank <br />Number, Stored Product, etc) <br />1 1 UNL FILL <br />2 2 PRE FILL <br />3 3 DIE FILL <br />4 1 UNL FILL <br />Bucket Installation Type: <br />El Direct Bury <br />❑X Contained in Sump <br />❑ Direct Bury <br />X❑ Contained in Sump <br />❑ Direct Bury <br />X❑ Contained in Sump <br />E] Direct Bury <br />X❑ Contained in Sump <br />Bucket Diameter: <br />12 <br />12 <br />12 <br />12 <br />Bucket Depth: <br />14.5 <br />13 <br />13.75 <br />14.5 <br />Wait time between applying <br />vacuum/water and starting test: <br />5 mins <br />5 mins <br />5 mins <br />5 mins <br />Test Start Time (Tl ): <br />1431 <br />1418 <br />1418 <br />1441 <br />Initial Reading (Rl ): <br />13.75 <br />12.25 <br />12.875 <br />13.75 <br />Test End Time (TF ): <br />1433 <br />1518 <br />1518 <br />1443 <br />Final Reading (R F ): <br />12.5 <br />12.25 <br />12.875 <br />12.5 <br />Test Duration: <br />2 mins <br />1 hour <br />1 hour <br />2 mins <br />Change in Reading (R F- R1 ): <br />1.25 <br />0 <br />0 <br />1.25 <br />Pass/Fail Threshold or <br />Criteria: <br />visual <br />visual <br />visual <br />visual <br />Test Result: <br />❑ Pass [Z] Fail <br />[fl Pass ❑ Fail <br />1fl Pass ❑ Fail <br />❑ Pass [K] Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />checked rubber seals around the outside of the 87 fill spill bucket, they were in good <br />condition. <br />spill bucket visually appeared to be in slight oval shape on side of bucket. <br />_retested spill bucket and water still continued to leak from top side of spill bucket. <br />repair and retest. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature:Date: 09/14/2009 <br />1 State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />