Laserfiche WebLink
The Remedial Investigation (RI) Quality Assurance/Qua <br />intended to facilitate the acquistion of accurate and reliable <br />during the RI will be collected and analyzed following pi <br />Control Program. A Quality Assurance Program has been e <br />Control Program is effective. Both programs are neces <br />documentation for investigations and laboratory analyses. <br />precedures will be implemented to ensure that QA/QC obji <br />1.0 RECORDING OF FIELD DATA <br />All information pertinent to the field investigation will be <br />to be documented includes at least the following: <br />- Sample numbers <br />- Locations of sample collection <br />- Soil boring or well numbers, as applicable <br />- Depths at which samples were obtained <br />- Names of collectors <br />- Dates and times of collection <br />ity Control (QA/QC) program is <br />data. Environmental data gathered <br />Dcedures prescribed in the Quality <br />,tablished to assure that the Quality <br />my to provide accurate data and <br />The following field and laboratory <br />ctives are met. <br />I� <br />- Purpose of sample <br />I! <br />- Sample distribution (e.g. laboratory, archive, etc.) <br />- Field observations <br />Field measurements (e.g. PID readings, pH, <br />- Other data records (e.g. development log, soil <br />2.0 SAMPLE CONTAINERS <br />in a field log book. Information <br />vity, water levels.) <br />report, well log, etc.) <br />Groundwater samples will be placed in containers suppliedli;by the analytical laboratory. Table <br />1 summarizes the required sample containers. Soil samples will be collected in either 8 -ounce <br />widemouth clear glass jars provided by the laboratory or in clean brass or stainless steel tubes <br />(Table 1)/ Screw on caps will be fitted with teflon liners. Tubes will tightly capped and sealed. <br />1 <br />