Laserfiche WebLink
_ a <br />r <br />I <br />remediation through sampling of the stockpiled soil, was used to backfill the excavation. The work was <br />11 <br />performed under the direction of the APCD and local fire district after the San Joaquin County Public <br />Health Services, Environmental Health Division and the California Regional Water Quality Control <br />Board indicated that their oversight would not be providedaI <br />PROPOSED SCOPE OF WORK <br />Ground Zero will supervise the drilling of a single soil bor <br />and dispenser island. The location of the proposed boric <br />performed by Spectrum Exploration (C57-512268). The be <br />below grade. This depth should represent the capillary <br />information from Uriah Environmental. A soil sample w <br />capillary fringe zone at approximately 25 feet below grad <br />washed brass tube, sealed with teflon tape and plastic endc <br />under chain of custody to Argon Laboratories (DHS -1873 <br />Subsequent to soil sampling, a discrete water sample <br />Hydropunch II water sampler. The water sample will <br />implement into the water table using a 140 -pound drop ha <br />the screened portion of the sampler under natural hydra <br />collected using a pre -washed bailer into appropriate conta <br />will be labelled, placed on ice, and transported to Argon <br />ig (SBI) in the vicinity of the former tanks <br />is shown on Figure 2. Drilling will be <br />-ing will be drilled to approximately 25 feet <br />fringe zone of the water table, based on <br />1 be collected from boring SB1 within the <br />. The sample will be collected into a pre- <br />ps, labelled, placed on ice, and transported <br />in Ceres, California for analysis. <br />be collected from the boring using a <br />collected by driving the Hydropunch II <br />er and allowing groundwater to flow into <br />Ic pressure. The water sample will be <br />supplied by the laboratory. The sample <br />)oratories for analysis. <br />The boring will subsequently be grouted to the surface with a neat cement grout. Field work will be <br />performed in accordance with Ground Zero's Quality As 11 Control plan (on file with <br />PHS/EHD) and Site Safety Plan (SSP, Attachment B). <br />Soil and groundwater samples will be analyzed for total petroleum hydrocarbons as gasoline (TPHG) <br />by EPA method 8015 modified and benzene, toluene, ethylbenzene, and xylenes (BTEX) by EPA <br />method 8020. <br />Field and analytical data will be summarized in a brief letter report. <br />The field work has been tentatively scheduled for Thursiday, September 7, 1995 if PHS/EHD can <br />accommodate Mr. Ranuio's request for expedited review iof this workplan. Enclosed is a completed <br />permit application and associated fee. it <br />I <br />it <br />i <br />h:\wp51 \groundze\lane\ranuio. wkp 2 <br />