Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br />SAN JOAQUIN COUNTY <br />Unit Program <br />2' ;2 Donna K. Heran, R.E.H.S. �' <br />Coordinators <br />a' < Director 600 East Main Street Carl Borgmi <br />n, R.E.H.S. <br />— Stockton, California 95202 Mike Huggins, I <br />E.H.S., R.D.I. <br />Margaret lag, <br />ogCjFd„p i'�P Laurie A. Cotulla, R.E.H.S. Telephone: (209).468-3420 Robert McCleon, <br />rio, R.E.H.S. <br />R.E.H.S. <br />Assistant Director Fax: (209) 468-3433 .teff Carrues <br />o, R.E.H.S. <br />Kasey Fole <br />, R.E.H.S. <br />APPLICATION FOR PERMIT TO CLOSE <br />UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br />GENERAL INSTRUCTIONS: <br />[ ] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br />applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), ?iping, streets, <br />adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water wells, building;, underground <br />public utility lines (including water, sanitary sewer and storm sewer), and distance of piping from tank to dispensers. If <br />underground utilities are not included on the site map, you must state in writing that USA Dig will be cot tacted prior to <br />excavation activities. <br />[ ] 3. Complete pages 3-6, "Application for Underground Storage Tank Closure Permit".of : Samdlinr a firm shall <br />be an independent third party from the contractor. <br />[ ] 4. Complete page 9, "Authorization to Release". This form must be signed and dated by the <br />OWNER/OPERATOR of the facility. <br />[ ] 5. Submit a "Service Request" form with the appropriate fees, submit completed UPC forms for Facility and Tanks <br />(formerly State A & B forms) and complete the "Underground Storage Tank Program Fee Worksheet". <br />[ ] 6. Complete all questions on page 10, the Environmental Health Department (EHD) "Underground Storage Tank <br />Disposition Tracking Record", except those repuirine a signature and date of tank removal The holder of flLe permit shall <br />be responsible for ensuring that this form is completed and returned to EHD within 30 days of the tank removal. <br />[ ] 7. Submit a "SIte Health & Safety Plan" as an addendum to this application, to address all potential h zards for this <br />specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br />[ ] 8. If facility is located outside of the city limits, submit a 'Backfill Excavation Certificate" as re uired by the <br />County of San Joaquin Building Department and the incorporated City Building Departments, pursuant t the Uniform <br />Building Code STD 70-11. <br />[ ] 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to E approval of <br />the closure plan. <br />[ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately cornleted plan. If <br />gross deficiencies are identified, an addendum will be required with a $105.00/hour fee and the review will begin on the <br />date of resubmittal. <br />[ 1 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br />f ] 12. Advance infection notice of at least 48 hours is required by EHD <br />[ ] 13. Submit Contingency Plan for over -excavation at time of UST removal (if planning to over -excavate). <br />See "III. SITE MITIGATION” on Page 2. <br />EH 23 046 (Revised 07/31/08) <br />