Laserfiche WebLink
0 0 <br />8. a. Describe the method that will be utilized to purge andlor inert the tank(s� <br />b. TankiPiping Hauler. <br />Vamp. <br />Address city Zip <br />Phone No.( ) <br />Hauler Registration M (it hauled as hazardous) <br />C. Tank0ping Disposal Site: <br />Varna <br />Address city Zip <br />Phone No4 ) <br />EPA IDN (if transported to a permitted TSD facility) <br />9. Is the sampling firm an independent third party from the contractor? YES [ f NO[] <br />9a. Describe, in detail. how the soil andlor water sample(s) beneath the tank and piping will be obtained: <br />10. Describe how the excavation will he hackfilled with suitable material upon removak <br />II. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />b) What will be the final destination of the excavated stockpile? <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Name Hauler Registration M <br />Phone No. <br />EH 23 046 (Revised 10119198) Page 5 <br />