My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
20500
>
2300 - Underground Storage Tank Program
>
PR0502021
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 2:43:53 PM
Creation date
9/12/2018 10:01:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0502021
PE
2361
FACILITY_ID
FA0005302
FACILITY_NAME
SPRECKELS SUGAR COMPANY
STREET_NUMBER
20500
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95304
APN
21216010
CURRENT_STATUS
02
SITE_LOCATION
20500 HOLLY DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Location <br />Owner <br />Contractor <br />&CKFILL EXCAVATION CERTIFICATE 0 <br />Phone <br />Phone No <br />License No. <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12" lifts: <br />_ A. Pea gravel --smooth, rounded material not more than one-half (112) inch in diameter <br />_ B. Crushed rockāself-compacting material not more than three-quarters (3/4) inch in cross sectional <br />Elie backfillnmaterial and tanks/pipes [Wade of poly Use of crushed rock will not be resin glass or simd for ilar if <br />well be made between <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per m B gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Cade <br />Appendix Chapter 70. <br />t ame ( nnq <br />u e ( rtn[) <br />tgnamre <br />Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.