Laserfiche WebLink
P <br />-3-01-1999 2:47PM FROM <br />SAN JOAOUIN (LONTYLI TT��NANVIENVIRONMENTAL a DstoN <br />UMOERMM=TK�„FEEYOSET <br />FACILITY CONTACT PANE <br />S FACILITY SITE NAME ANNE OGREY <br />I HOLLY SUGAR dba SPRECKELS SUGAR <br />T SITE PHONE S with AREA CODE <br />'E FACILITY ADDRESS 209-835-3210 <br />20500 HOLLY DRIVE <br />& I STATE ZIP CODE S o4 TANKS <br />A <br />CITY TRACY CA 95376 at SITE ONE <br />P APPLICANT CONTACT NAME <br />PI APPLICANT/BILLING NAME ANNE OGREY <br />L SAME <br />I APPLICANT PHONE 3 UITH AREA CODE <br />j C MAILING ADDRESS 209-835-3210 <br />A SAME AS ABOVE <br />N I STATE L1D CODE TYPE of APPLICATION <br />T cIrY I (Closure, trtstaLlation, etc.) CLOSURE <br />TOTAL <br />ANNUAL FACILITY FEE (Prior to January 1, 1991) • S10O.00 <br />T FACILITY PENALTY FEES ASSESSED (If APOCiCable) <br />I <br />V TANK FE. = i50-00/YANK (Prior ca January 1,1991) <br />E 1988 Y Tanks = 1989 11990 1991 ' 1992 <br />F (multipLy by `ee for <br />A each, year applicable) Xx%X I XXXX I XXXX XX%% %%%% <br />C <br />I TANK PENALTY FEES ASSESSED I xXXX %xXX xxxx I xXX% XXXX <br />L <br />I 57ATE SURCHARGE FOR NEW FACILITIES ONLY -S16 -5C <br />T1988 through 1993 (556) <br />T Y TanKS_ z 58.00 <br />SURCHARGE FOR 1998 1 XXXXXXXXXXXXxxXXXXXX%XXXXXX <br />1986 11987 <br />' <br />1988 11989 <br />L E-- 578.00/hour (3 hours miniw%WTANK) I <br />0 CLOSURE F E <br />11990 <br />i <br />(?Lan Review & In60eCtiOns) <br />)=X ! <br />X%X% I <br />zXXX <br />XXXX <br />S xxxxxxxx <br />xxxx <br />XXXX <br />xxxx <br />xxxx <br />xxxx <br />s X=XX%XX <br />%170/TANK <br />(After Jaruery <br />1, <br />1991) <br />234 <br />1993 11994 <br />11995 <br />1996 + <br />1997 <br />1998 <br />IS <br />1993 through 1997 (S56)1 1998 <br />xxxxxxxxxxxxxxxxx)mv= I <br />C! PERMANENT CLOSURE <br />(Removal or Authorized Closure-in•P(aCc) <br />TANK I.O. 2(S) <br />L E-- 578.00/hour (3 hours miniw%WTANK) I <br />0 CLOSURE F E <br />s TANK($) 1 x 5234.00 a <br />S' <br />U TEMPORARY CLOSURE <br />(?Lan Review & In60eCtiOns) <br />TANK I.D. s(S) <br />RFACILITY) <br />E1 T�PORARY CLOSURE <br />FEE = S78.00/hour (3 hours minimlAa/ <br />sZ34.00 minimum <br />INSTALLATION PLAN CHECK (Plan Review & Cons;7VCLfOn InspeCc <br />ian5)I TANK 1.7. x(S) <br />PLAN CHECK FEE I 578.00/hour (3 hours minimlm/FACSLITY7 e %6Z4,00 mini" <br />S <br />5 234.00 <br />5 <br />5 <br />t REPAIR FEE (Workplan Review & Construction InSp- Vons) iTANK <br />LD- J(S) <br />TANK LINING REPAIR FEE = S78.00/hour (3 hours minioam/TANK) <br />Y TANK(5) x 123'•00 • <br />S <br />'TANK RETROFIT REPAIR FEE = S78.00/hour (3 hours min./FACILITY) <br />= 2234.06 mini- m <br />S <br />I ----------------- <br />R= <br />PIPING REP0.1R FEE + 578.00/hour (3 hours minimum/FACILITY) <br />5234.00 mini" <br />% <br />z EZO.OD I I UNAUTHORIZED RELEASE EOALOATIOY =278.00/hr 1 <br />�S <br />Ni TRANSFSR FEE <br />I i I <br />S= <br />FEE <br />x7'8.00/hr I I <br />S <br />CI CONSULTATION FEE ' 178,00/hr I I SAMPLING INSPECTION <br />234 <br />TOTAL OUE <br />5 .00 <br />P. I A <br />MAR 01 '99 14 57 <br />PAGE. 14 <br />