My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
2300 - Underground Storage Tank Program
>
PR0231482
>
COMPLIANCE INFO 1994-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 4:57:02 PM
Creation date
9/12/2018 4:47:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1994-2010
FileName_PostFix
1994-2010
RECORD_ID
PR0231482
PE
2361
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RPR -01-2003 08:29 AM DONLEE PUMP CO. 209 537 9398 P.01 <br />• • <br />S� J Fax: (209) 164 — 0138 DOW: 1 Uesday, Apri101, 2(163 <br />u 13 l63 <br />2>l'25128ilroad Av4,ttge - <br />Ceroe;, Ca 95�4i`t <br />Ph: (209) 537 — %06 <br />Fx: (209 ) 537 - 9398 <br />Lrttafl: donm(�dtJtt%itttiM1p.coril, <br />APR 0 1 2003 <br />�:NVIRURMENT HEALTH <br />PERMIT/SERVICES <br />To: Test Scheduling Comp: San Joaquin County <br />Environmental Health pA; y68-3gZ0 <br />►�v5�°"` <br />From: Don Mathey — Office Manager Pages: 1 (including this page) <br />Re: SS -989 Repairs and testing <br />Notes: <br />We are seeking scheduling permission to perform repairs and S13-989 testing at: <br />Madsen's Sunrise Dairy 239 S. Stockton St., Ripon, CA 95366 <br />L �A/ After original testing, it appears we will need to reseal/refit boot and other connections in <br />sumps locations. We will fax/mail results of our testing to you after, work is complete. <br />T re/r- <br />V -,Lk �1�(/ <br />\jt L, vl <br />r Regards, <br />We would like to perform this work on Thursday April 3, 2003 if possible. Phase, let us <br />know if that is an acceptable date for you. Also, advise us of any permits we may need <br />before going to the site to perform these repairs and retesting. <br />A F F I L I A T E <br />I III NIP <br />tlrrYl�L■�W <br />i6UM EQEJIPMENT 1N <br />FFr-1`-QA <br />.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.