My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
2300 - Underground Storage Tank Program
>
PR0231482
>
COMPLIANCE INFO 1994-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 4:57:02 PM
Creation date
9/12/2018 4:47:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1994-2010
FileName_PostFix
1994-2010
RECORD_ID
PR0231482
PE
2361
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC -31-2002 10:37 <br />AM <br />D*EE PUMP CO. 2097 9398 <br />P.05 <br />51\'RCe, January 2002 <br />UDC#UDC# UDC# UDC# <br />UDC tvfanufaclurcr: edC u W <br />Page aft <br />S <br />7. <br />UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />UDC Depth; <br />Test Slediod Developed Hy: u UDC Manuracturer fd'Iftdustry Standard C Professional Engineer <br />C Odier (Specify) <br />Tcst Slcdtad Uscd: D Pressure Cl Vacuum G3gydrosuttic <br />❑ Odter (SuciJY) <br />Test Equipment Used; %S %S lNGDh Equipment Resolution: <br />UDC#UDC# UDC# UDC# <br />UDC tvfanufaclurcr: edC u W <br />L'DC Nfaterial: <br />S <br />UDC Depth; <br />HCight from UDC Bottom to Top <br />H <br />h <br />Lot' Highest Piping Penetration: <br />Hci_lit from IIDC Bottom to <br />// f' <br />zy r} N <br />Lamest Electrical Penetration: <br />Condition of UDC prior to <br />e-ZAMN <br />L--r•-L'ln'-� <br />ICslim,; <br />LL.I-''X1.�J <br />Pon ion of UDC Tested <br />[p[J <br />Does turbine shut down when <br />UDC sensor defects liquid (both <br />-Yes 'No 2'<A <br />-Yes ::No :;<A I =Yes No E W <br />1: Ye IN o -,�NAr <br />y <br />I product and mater)^ <br />Turbine shutdown response dille <br />Is system programmed for fail- <br />C Yes C No t�A <br />__�� <br />Z Yes C No 'r A C Yes D No RIGA <br />-Yes DNo E<A <br />1 $ari shutdown? <br />I Was fail -side verified to be <br />a erationalf <br />nYes CNo D -NA <br />- <br />EYes uNo E44k CYes 0 N G)VX <br />CYes E: No 2 -KA <br />Wait time between applying <br />acuuni o:ner and <br />D 7y w <br />l b <br />stash , to <br />slartins lest <br />Test Stan Time: <br />17 <br />ITZ <br />Initial Reading (R,): <br />8 <br />Test End Time: <br />1 <br />F7 W <br />Final Reading (RF): <br />-(o <br />Test Dumlion: <br />Change in Reading (RF -R,): <br />C7 Q . <br />Poss,'Fail Threshold or Criteria: <br />'F5C1.55 <br />Test Result: <br />D Pass al"ail <br />F"Pass 0Fail 0 Pass Rrall <br />p PassDFail <br />teas sensor removed for testing? <br />G Yes C No C NAI <br />- Yes C No C NAI C Yes CNo CNA <br />G Yes a No ENA <br />Was sensor propedyreplacedand <br />r r <br />CYes No NA <br />CYes CNo -NA CYes 1No DNA <br />❑Yes 0 N CNA <br />�critled fitnctional tt(tenestine? <br />Cont meitts - (include informtarlon on repairx made prior ro r¢xdme and recommended foflom-up for faile(1 rests) <br />If the cntire depdt of the UDC is not tested, specil\• how hutch mts tested_ If dte austter to of the questions indirucd with nn <br />asterisk (•) is "NO" or "NA", the entire UDC must be tested. (Sec S\VRCB LO -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.